OFF-ON-NEAR & RE-SHORING: DE SUPPLY CHAIN UITDAGINGEN VAN NU HARRY VAN DEN HEUVEL UTRECHT 12 MAART 2014
Business areas POWER PLANTS SHIP POWER SERVICES 2 Wärtsilä 19 March 2014
Profitable growth by focusing on three areas Smart Power Generation Gas as a fuel Environmental solutions The transition to sustainable and modern energy systems drives the demand for smart power generation. Economic and environmental reasons increase the growth of gas solutions in marine and power plant markets. Environmental regulation and increased focus on improved efficiency create demand in the marine industry. 3 Wärtsilä 19 March 2014
Complete portfolio Automation Power drives Power distribution Environmental solutions Communication and control Ship Design Propulsion Seals & bearings Engines Flow & Gas Solutions Service agreements 4 Wärtsilä 19 March 2014
Wärtsilä s product portfolio 4-stroke engines 2-stroke engines Gensets & auxpacs Propellers FPP/CPP Steerable thrusters Transverse thrusters Energy efficiency systems Frequency converters Propulsion controls Automation, monitoring & control I/O cabinets Switchboards Gears Catalysts (SCR, Oxicat, etc.) Seals, Bearings & Sterntubes Flue gas desulphurisation & scrubbers Pumps and valves Flow solutions Ballast water system LNG regasification Inert gas systems Ship design 5 Wärtsilä 19 March 2014
Contracting schepen * * Source: Clarkson Research Services * CGT= gross tonnage compensated with workload 6
Personeel Bijna 19,000 professionals, 114 nationaliteiten in 70 landen, op 160 locaties 7 Wärtsilä 19 March 2014
Wärtsilä s production and R&D Moss, Norway Inert gas and exhaust gas scrubber systems Havant & Slough, UK Seals & bearings Stord, Norway Electrical & automation systems Gothenburg, Sweden Water treatment, seals & bearings Hull, Reading Newcastle, UK Valves Poole, UK Water systems Drunen, the Netherlands R&D, Propulsion Vigo, Spain Seals & bearings Trondheim, Norway Frequency converters Rubbestadneset, Norway R&D Santander, Spain Propulsion Aalborg, Denmark Deepwell pumps and seawater lift pumps Vaasa, Finland 4-stroke engines, R&D Turku, Finland R&D Helsinki & Espoo, Finland R&D WTEC (Penza, Russia) 4-stroke engines Geestacht, Germany Fresh water generation & condensation plants Wärtsilä CME (Zhenjiang, China) Propulsion QMD (Qingdao, China) 2-stroke engines Suzhou, China Assembly & sourcing WHEC (Mokpo, South Korea) 4-stroke engines Toyama, Japan Seals & bearings Bermeo, Spain R&D Winterthur, Switzerland 2-stroke engines, R&D Khopoli, India Gensets, Auxiliary modules Wuxi, China Propulsion, seals & bearings WQDC (Shanghai, China) 4-stroke engines Açu Superport, Brazil 4-stroke gensets, propulsion Trieste, Italy 4-stroke engines, propulsion, R&D Singapore Engine room pumps, pump room systems and Fi-Fi pumps Fully owned sites Sites with R&D Joint Venture sites 18 licensee sites 8 Wärtsilä 19 March 2014
70 countries, 160 locations, 11,000 service professionals Installed base 181,000 MW Wärtsilä Services global network Widest range of offering and expertise 9 Wärtsilä 19 March 2014
Uitdagingen van nu en de toekomst Wärtsilä s Strategy, Missie en Visie. Situatie van nu en over 5 jaar? Waarom veranderen? Vergelijk met Supply chain van concurrenten en markt trends Wat is benodigd voor welke markt positie? Wat en hoeveel moet worden verbetert? (situation appraisal and gap analysis) Volgen van off-shoring eigen productie processes Defineer plan Supply chain : meestal gericht op prijs minder op totale kosten
Category management and supply chain excellence Performance measurements External factors Expectations/ Requirements Supplier structuring Specification improvements Total Cost Evaluation People People Process improvements Risk Management Relationship development Supply chain excellence
Kosten Groot gedeelte van de kosten van een onderneming zijn extern (=inkoop)
Voorbeeld percentages gegeven door leverancier 120 100 80 36,5? Overig (MOH, GSA, Winst) 60 13,5? Directe arbeid Directe materialen 40 20 50? 0 %
Voorbeeld directe materialen: Buis Gewicht = 150,4 Kg + 6 Kg = 156,4 Kg Cuni10fe prijs per Kg = 3,86 (vermenigvuligd met factor 1,5 om buis te maken) ) = 5,79 156,4 x 5,79 = 905,56 905,56 / 9262 = 0,097 = 9,75 % (van de koeler prijs)
Kosten warmte wisselaars 120 Winst 100 80 9 9 14 36,5 36,5 GSA Productie Rest (MOH, GSA, Winst) 60 11 13,5 13,5 Directe arbeid 40 20 0 57 % Industry averages 50 13,75 18,5 9,75 8 % % Rest directe materialen?? Directe materialen Staal delen (platen and covers) Buizen Plaat
Wartsila
Conclusies en aanbevelingen Sourcing van Europa in Azie bij 30-40% initieel prijsvoordeel Opportunisme? Wat bepaalt prijsvoordeel als >50% materiaal is Waarom veranderen; definieer het doel : - situatie beoordeling nu en over 5 jaar en creeer alternatieven - kosten besparing en/of geografische markt spreiding Defineer de nadelen: extra tijd, extra kosten, extra risiko, inspecties, keur, testen, belasting, regelgeving, Definieer succesfactoren specifiek per product en markt: lagere arbeidskosten, betere technologie, kortere levertijd,.. Meestal zit het voordeel in arbeidskosten (hoog percentage vd prijs)
Conclusies en aanbevelingen Wärtsilä volgt de markt (klanten) als Total solution provider : - 90% vd scheepsbouw is in China, Zuid-Korea en Japan - De supply chain China en India als eerste in beeld De supply chain is aangepast vooraf en gelijk met off-shoring en re-shoring Ken de regels en wet geving: Bijv: sommige landen stellen eisen voor local content Lokaal zijn organisaties met kennis en vaardigheden ontwikkeld ( o.a. lokale strategische inkopers) Kortere doorloop tijden (capital tied up) Specifiek know how wordt niet uitbesteed of IP rechten liggen bij leverancier
Conclusies en aanbevelingen Power plants supply chain hoofdzakelijk Europa en India Projecten worden centraal verscheept vanuit 1 punt in Europa Ship power supply chain dichter bij de klant en locale productie locaties Service s supply chain gebaseerd op supply chain van Power plants en Ship power. Centraal distrutie centrum van onderdelen in Nederland.
Dank U!