CE & BIM de kostendimensie in het bouwmodel BIM, de groeispurt van een werkwijze in ontwikkeling. (en ja, daar horen ook groeipijnen bij.)
Who is Royal Haskoning.
Some definitions Building Information Modelling (BIM) is the process of generating and managing building data during its life cycle. Little BIM can be understood as company internal databases and software. Big BIM refers to its integration, interoperability and communication on a project, national or international level. nd modeling : The expansion of 3D CAD modelling with other design attributes (such as time and cost estimating). A true nd model also includes accessibility, crime, sustainability, maintainability, acoustics and energy simulation.
200 BIM, just a few things to take in.. BIM Building Information nd Modeling When to start Who Who decides what? Access? Monitor or not? Who decides Reports How to search Templates Document management Prevent duplication Workflows? Who mutates Track changes? Cost estimating Way of working Internet Bijzonder Irritant Modewoord? Authorizations When to delete Standards 4
BIM levels and impact on the organisation Whatever level you choose, control is always from the cockpit! So be careful what you wish for..
Industrial Engineering Client : Rubis Terminals, France Type of Plant : Tank terminal for chemicals Start / Completion : June 2006 / June 2008 Location : Rotterdam Botlek, The Netherlands Scope of work : Basic Engineering, EPCM Services Contract form : Lump sum Features - Liquid bulk terminal for K1/K2/K3 chemicals and fuel oils - Scope includes: product storage tanks incl. associated pumps and piping, vapour treatment system,truck & railcar (un-) loading, jetty and site infrastructure. - Greenfield project - Co-siting : utility sharing with neighbours - Rail infrastructure - Development of automation concept
Industrial Engineering - Client: Confidential - Type of Plant : Catalyst Production Plant - Start / Completion : August 2008 / August 2010 - Location : South Africa - Scope of work : Basic Design, EPCM Services - Contract form : Reimbursable - Features - Greenfield development of existing catalyst plant - Design based on modified copy - Over 250 new equipment items - Fast-track though cost driven - Construction while existing plant in operation - Web-based document control
Industrial Engineering Client : Confidential, Type of Plant : Oil Refinery Location : The Netherlands Start / Completion : 2008-2010 Scope of work : Basic Design, EPCM Services, Permit Application Contract form : Reimbursable with KPI Incentives Features - Flaregase compressor system implementation - Remove SO2 and to (re)use it as fuel gas. - >99 uptime required - Construction in a live plant - Fast-track project
Current BIM status, Industrial divisions Project phases and CE tools: 1) Business Planning (FEL1) Tools: cost models / Aspen ICARUS 2) Facility Planning (FEL2) Tools: IBIS / Aspen ICARUS 3) Project Planning (FEL3) Tools: IBIS / Aspen ICARUS 4) Project Implementation Tools: IBIS / Cleopatra (Detailed Design / Construction) 3D Modeling tools: -Bentley AutoPlant -Aveva PDMS
Building Services and Structures
Infrastructure & Transport
Water
Current BIM status, Building, Infra, Water divisions - Projectmatig ontwerpen en wijzigen in 1 model door meerdere disciplines. Centrale data opslag, BIM server. Revisie beheer, wie, wat, waar wanneer. - Rapportages via templates op nd data Materialen, hoeveelheden via gebruikte ontwerp bibliotheken. verschilstaten, vergelijk diverse ontwerpvoorstellen. - Plugin naar DMS (Organice) Publiceren van documenten naar DMS, registratie en revisie beheer. Toegankelijk voor alle partijen, communicatie medium binnen het project.
BIM in progress at RH In Progress: - Further integration of 3D design software. (Revit, AutoPlant, PDMS) - Implementation of equipment cost database. - Full integration of FWBS coding system in 3D design software. - 4D and 5D implementation. (Navisworks Timeliner, CE tools) - IBIS4BIM? (met Plugin op Revit en Integratie van Navisworks) Status before the implementation of BIM (manual, 2D or 3D CAD) PRE-BIM BIM Stage 1: Object-based MODELLING BIM Stage 2: model-based COLLABORATION BIM Stage 3: network-based INTEGRATION 1 2 3 Integrated Project Delivery, the long term goal of BIM implementation IPD
IPD, Integrated Project Delivery
Areas of development. Afspraken Wie doet wat Schoenmaker blijf bij je leest Opleiden Extern / intern Divisie leert divisie DMS BIM ondersteunende Software Techniek Ontwikkelen infrastructuur Inrichten ICT omgeving. Informatie Uitwisselen tussen disciplines Uitwisselen tussen bedrijfstaken Werkmethodieken, o.a 3D scanning nd Modeleren. Standaarden Centraal Toeleveranciers, RGG, NLCS Communiceren 3D pdf Navisworks 16 16
Voordelen en aandachtspunten Voordelen Centrale opslag van data. Betere coordinatie tussen partijen. Efficienter plannen. Minder change orders Efficienter doorvoeren van ontwerpwijzigingen. Tijdwinst door koppeling van data Terug brengen van constructie tijd. Eenduidige communicatie. Minder ontwerpfouten. (o.a. Clash controle) Nauwkeuriger begroten van kosten (= kosten besparingen) Hogere kwaliteit van documenten. Visualisatie mogelijkheden. Aandachtpunten Blijf scherp, hou gezond verstand paraat. Investering en ROI. Opleiden personeel. Aanleren nieuwe werkwijzes Impact op gehele organisatie. (het raakt alles) Minder geschikt bij Fast track projecten?
ICC: International Crime Court. 18
BIM implementation traject, a similarity with Star Trek? BIM me up, Scotty! The phrase typically implies being faced with an unpleasant, overwhelming or insolvable problem, or conversely; with the completion of a difficult task. Wikipedia