North/South-line: The connection with tomorrow

Maat: px
Weergave met pagina beginnen:

Download "North/South-line: The connection with tomorrow"

Transcriptie

1 North/South-line: The connection with tomorrow 1

2 The north/south line 1. Introduction 2. Tecnics 3. Organisation Break 4. Risk management 5. Current status 6. Questions and possible answers 2

3 North/south line 2. Tecnics Why a North/South-line The city Alignement construction techniques Stations Monitoring Safety sytems 3

4 North South line: part of a regional system 4

5 North/Southline: Part of the local public transport system 5

6 Travelling speed of public transport systems V(traveler) [km/hour] CITY (dense grid) Busses & streetcars REGION City environment : metro 35 Region : bus > 35 PROVINCE Train LAND Intercity trains > 60 6

7 Gemeente Amsterdam North/Southline: stations 7

8 2011 without North/South line 8

9 2011 with North/South line 9

10 The North/South-line: horizontal alignment In situ TBM In-situ Submerged tunnel In-situ surface construction South Inner-city North 10

11 North Construction: Tracks & Stations at surface level. Shallow insitu built tunnel 11

12 Inner city Submerged tunnel Caissons Twin bored tunnels Deep stations (cut & cover) 12

13 South Twin bored tunnels Deep station (cut & cover) Shallow station (cut & cover) In-situ tunnels 13

14 Construction methods 14

15 Central Station :

16 Central Station : actual situation 16

17 Central Station:

18 5 Station Geb. IJ-zijde Emplacement NAP -5 Ophoogzand Klei zandhoudend IJ-klei Zand weinig silthoudend Eemklei 18

19 19

20 Central Station:submerged tunnel 20

21

22

23

24 Gemeente Amsterdam

25 25

26 26

27 27

28 Cut & Cover building pits 28 28

29 Station Rokin 29

30 Station Rokin : entrances 30 30

31 Station Rokin: platform 31

32 South, vertical alignment 32

33 Ferdinand Bolstraat 33

34 Station Ceintuurbaan 34

35 Station Ceintuurbaan 35

36 Environment: monitoring (early warning) 36

37 The North/South-line Amsterdam 3. Organisation Project organisation 37

38 Gemeente Amsterdam Organisation Organogram Projectoffice Noord/Zuidlijn Director (1 fte) Manager Communicatiion (1 fte) Head Stafoffice / Projectsecretaris (1 fte) communication-adviser (1 fte) office manager (1 fte) projectsecretary (2 fte) juridical assistant (1 fte) city board assistant (1 fte) Manager Finance & Planning (1 fte) controller (2 fte) General Construction Manager (0,7 fte) Manager Suurounding (1 fte) Constructionmanager Cluster A (1 fte) Construction manager Cluster B (1 fte) Construction manager Cluster C (1 fte) Construction manager Cluster D (1 fte) Projectleader surrounding projects (1 fte) Constructioncoordinator surrounding (1 fte) Head Projectcontrol (1 fte) projectcontrol (3 fte) secretary (1 fte) 38

39 Gemeente Amsterdam Organisation Constructionmanagement Projectoffice Noord/Zuidlijn Contractmanagement Consultantoffice Noord/Zuidlijn Director projectoffice Head Consultingoffice General Constructionmanager General Contractmanager Constructionmanager Cluster A Constructionmanager Cluster B Constructionmanager Cluster C Constructionmanager Cluster D Contractmanager Cluster A Contractmanager Cluster B Contractmanager Cluster C Contractmanager Cluster D Relatie Projectbureau - Adviesbureau 39

40 Gemeente Amsterdam Organisation Control each contract Constructionmanager PB Contractmanager AB Head Daily Control AB Contractor 40

41 Gemeente Amsterdam Organisation Structure of organisation: Board <-> PO: alderman staff board team PO <-> Consultant office: general contract meetings Construction Manager<->Contract Manager Consultant Office <-> contractor construction meeting 41

42 The North/South-line Amsterdam Break 42

43 The North/South-line Amsterdam 4. Risk management Topics Analyzing risks Reducing risks Testing Contract filosofy TBM Environment Monitoring No insurance CAR 43

44 The North/South metroline Amsterdam Risk perception Risk management Risk analysis 44

45 The North/South metroline Amsterdam Topics: The project The start: analyzing the risk profile Reducing the risk profile Environment (surroundings) Actual situation (contractors) 45

46 The Project: passengers / day 9 km long new infrastructure 6 km subsurface 4 complex deep stations 2x4 km single track twin bored tunnels in operation:

47 Overview of the construction methods caissons Submerged tunnel In situ tunnel Twin bored tunnels In situ tunnel Level South Inner City North 47

48 ANALYZING THE RISK PROFILE Focus on Inner city. Use of TBM in the city of Amsterdam Deep stations Passage of the Central Station 48

49 REDUCING THE RISK PROFILE Goal (1994): The risk profile of the construction of the North/South metro line should be less or equal to a substantial traditional project Actual situation (2003): General consensus that this goal is achieved 49

50 REDUCING THE RISK PROFILE Risk analysis & management: Design Organization Contracts Investing > 100 million in risk reducing measures 50

51 REDUCING THE RISK PROFILE Design: Horizontal alignement follows street pattern. Vertical alignement bored tunnels determined to avoid obstacles. Carefull choice of station location. 51

52 REDUCING THE RISK PROFILE Design: Development of design tools Design by testing Investigations (soil & buildings) Mitigating measures 52

53 REDUCING THE RISK PROFILE Investing [million] Soil investigation 3 Building investigation 3 Foundation reconstruction 20 (30%) Monitoring system 15 Mitigating measures 40 Research & design by testing 15 etc. Deep stations Passage of the Central Station 53

54 Design by testing: why? 54

55 4D FEM model TBM & subsurface 55

56 TBM driven track tunnels & pile foundations 56

57 GEO-GIs FSPT FSIT TBM / TVIT Design by testing (Full scale tests) 3D-EEM Monitoring Lining test IBCS 57

58 OVERVIEW FULL SCALE TESTS Influence TBM on pile foundations Vibration behavior tunnellining & pile foundations Slurry wall Tail void injection [1:5] Soil treatement tests Use of drilled steel piles to large depths Use of large diametre steel piles in limited space Compensating Grouting trail 58

59 DEEP STATIONS : Ceintuurbaan 59

60 FULL SCALE SLURRY WALL TEST 60

61 CONSTRUCTION TECHNOLOGY Generating knowledge: Buildings Pile foundations Soil TBM process 61

62 FULL SCALE PILE TEST 62

63 FULL SCALE PILE TEST 63

64 CONSTRUCTION TECHNOLOGY 64

65 Full scale tests. Lining test Soil freezing Slurry wall test 65

66 Full scale tests. Tail void injection Tubexpile test Large diameter pile test Compensating Grouting Trail Soil treatment tests 66

67 FULL SCALE SOIL TREATEMENT TEST 67

68 FULL SCALE SOIL TREATEMENT TEST 68

69 TAIL VIOD INJECTION TEST [1:5] 69

70 SINGLE TRACK BORED TUNNELS Diameter 7 [m] Second sand layer Street pattern 70

71 71

72 Application of results. 72

73 REDUCING THE RISK PROFILE Organization. Fit for purpose (flexible) Management with technical expertise First, second & third opinions Making use of experience generated at other projects (site visits, trails) 73

74 Contractfilosofy TBM E/C- contract: Detail design of lining Detail mitigating measures design TBM Target price: Contractor price: part fixed, part variable Incentives Basic risc spread (BRT) 74

75 DIRECT COSTS (FIXED) DIRECT COSTS (VAR.) TARGET LOCATIONCOSTS GENERAL COSTS BASIC PROFIT TARGET & RISKS RISK CONTRACTOR RISK CITY. RISK FUND 75

76 DIRECT COSTS (FIXED) = INCENTIVE TARGET DIRECT COSTS (VAR.) LOCATION COSTS GENERAL COSTS BASIC PROFIT COST REDUCTION 1 2 TARGET & RISKS RISICO OPDRACHTG. 4 3 RISK CITY 76

77 REDUCING THE RISK PROFILE Contracts. Philosophy: 13 main contract clusters Contract form: E/C & (modified) RAW Contract attitude: Risk sharing & risk bearing Responsibility Trust 77

78 ENVIRONMENT Historical buildings: Assesment of condition Developement of settlement limits Mittigation measures Early warning system (monitoring) 78

79 ENVIRONMENT Lackof(public) space: Choice of construction methods Phased construction Construction of additional space 79

80 ENVIRONMENT Inhabitants: Communication Central claim office 80

81 MONITORING SYSTEM Base monitoring Early warning system Contract control Assurance Civil law 81

82 FOUNDATION INSPECTION 82

83 Pile plan Massive bearing wall Façade wall 1.2m 18m 7m Connection of piles with masonry walls Masonry walls Pile group 2 wooden piles average dia. 180mm 83

84 FOUNDATION INSPECTION 84

85 MITIGATING MEASURES Three types of mitigating measures: Foundation renovation Real time compensating grouting Compensating settlements by hydraulic jacks 85

86 COMPENSATING GROUTING 86

87 HYDRAULIC JACKING Munt Tower 87

88 ACTUAL SITUATION Most complex parts tendered 6 out of 7 contracts awarded: Contractors are known Participation of the contractors in detailled design started Foundation renewal in progres Monitoringsystem working 88

89 Q & A: After the break 89

Impacts Tallinn 31 st may 2018 Senta Modder - Germa Bakker

Impacts Tallinn 31 st may 2018 Senta Modder - Germa Bakker Scaling up Public Transport in a cycler s capital Impacts Tallinn 31 st may 2018 Senta Modder - Germa Bakker Via Invoegen Koptekst en voettekst kunt u de tekst wijzigen 1-6-2018 1 Summary 1. modal split

Nadere informatie

Stedelijke Ontwikkeling India

Stedelijke Ontwikkeling India Stedelijke Ontwikkeling India An Urban Challenge Leon van Velzen 23 april 2015 2 3 Urban Challenge Circular City Water Resilience Public Space Governance and Finance Data City Urban Challenge 4 Royal HaskoningDHV

Nadere informatie

1.1 ORGANIZATION INFORMATION 1.2 CONTACT INFORMATION 2.1 SCOPE OF CERTIFICATION 2.2 AUDITOR INFORMATION 3.1 AUDIT CONCLUSIONS 3.2 MANAGEMENT SYSTEM EFFECTIVENESS 3.3 OBSERVATIONS Organization Address Name

Nadere informatie

Internationale Ambities

Internationale Ambities Internationale Ambities Buiten de kaders denken en werken Peter van Westendorp Project Manager Oscar Koster Oscar Utrecht, Koster 17 juni 2013 Project Manager Arjan versie v/d 1 Pol Project Engineer Content

Nadere informatie

A4Kwartier fase 2 RIJSENHOUT

A4Kwartier fase 2 RIJSENHOUT A4Kwartier fase 2 RIJSENHOUT IEDERE AANSPRAKELIJKHEID IS BEPERKT TOT HET BEDRAG DAT IN HET BETREFFENDE GEVAL ONDER DE BEROEPSAANSPRAKELIJKHEIDSVERZEKERING WORDT UITBETAALD. ALLE DOOR ONS VERSTREKTE INFORMATIE

Nadere informatie

13 juni2012 Kivi Niria. Abjan Jacobse Teamleider geotechniek(botlekbrug)

13 juni2012 Kivi Niria. Abjan Jacobse Teamleider geotechniek(botlekbrug) 13 juni2012 Kivi Niria Abjan Jacobse Teamleider geotechniek(botlekbrug) Geotechniek bij de A15 Algemeen project / geotechniek Kunstwerken (Crossings) Botlek corridor Project Aanpassing snelweg A15 van

Nadere informatie

Project Update Community Meeting. October 29, 2009

Project Update Community Meeting. October 29, 2009 Project Update Community Meeting October 29, 2009 2 Presidio Parkway Project Overview Agenda Nidal Tuqan, Caltrans Project Manager Construction, Traffic and Ramp Closures David Pang, Caltrans, Construction

Nadere informatie

Travel Survey Questionnaires

Travel Survey Questionnaires Travel Survey Questionnaires Prot of Rotterdam and TU Delft, 16 June, 2009 Introduction To improve the accessibility to the Rotterdam Port and the efficiency of the public transport systems at the Rotterdam

Nadere informatie

Free Electives (15 ects)

Free Electives (15 ects) Free Electives (15 ects) Information about the Master RE&H (and the free electives) can be found at the following page: http://www.bk.tudelft.nl/en/about-faculty/departments/real-estate-and-housing/education/masterreh/free-electives/

Nadere informatie

Drones for Firefighting. Friday

Drones for Firefighting. Friday Drones for Firefighting Friday 17-11-2017 Introduction Martijn Zagwijn: Specialist Informationmanagement / Project Manager RPAS Brandweer Twente (Region 5) RPAS Drones project Firefighting Services Fire

Nadere informatie

Alcohol policy in Belgium: recent developments

Alcohol policy in Belgium: recent developments 1 Alcohol policy in Belgium: recent developments Kurt Doms, Head Drug Unit DG Health Care FPS Health, Food Chain Safety and Environment www.health.belgium.be/drugs Meeting Alcohol Policy Network 26th November

Nadere informatie

Designing climate proof urban districts

Designing climate proof urban districts Designing climate proof urban districts Presentation for Deltas in Times of Climate Change 2010 Jaap Kortman Laura van der Noort IVAM Maarten van Dongen Witteveen + Bos The Netherlands Presentation What

Nadere informatie

EFSI Info-session for the Flemish Region

EFSI Info-session for the Flemish Region EFSI Info-session for the Flemish Region Publieke financiering van infrastructuurprojecten voor transport, ziekenhuizen, onderwijs, water en energie,... Brussels, 14 September 2015 1 Eligibility voor EFSI

Nadere informatie

Modern Land Consolidation in the Netherlands

Modern Land Consolidation in the Netherlands Modern Land Consolidation in the Netherlands Adri van den Brink Government Service for Land and Water Management Wageningen University, Land Use Planning Group Volvic, 10 September 2004 Contents Introduction

Nadere informatie

PROJECT INFORMATION Building De Meerlanden Nieuweweg 65 in Hoofddorp

PROJECT INFORMATION Building De Meerlanden Nieuweweg 65 in Hoofddorp BT Makelaars Aalsmeerderweg 606 Rozenburg Schiphol Postbus 3109 2130 KC Hoofddorp Telefoon 020-3 166 166 Fax 020-3 166 160 Email: info@btmakelaars.nl Website : www.btmakelaars.nl PROJECT INFORMATION Building

Nadere informatie

small urbanism urban development with a small scale

small urbanism urban development with a small scale small urbanism urban development with a small scale Daniel Casas Valle urban design research Creative industries fund nl Mei 2013 small urbanism urban development with a small scale Robert Broesi Vincent

Nadere informatie

Notitie : In de grond gevormde palen met grondverwijdering

Notitie : In de grond gevormde palen met grondverwijdering Notitie : In de grond gevormde palen met grondverwijdering Waarom een notitie? Waarom een notitie? Onduidelijkheid van de norm? Waarom een notitie? Onduidelijkheid van de norm? of Landelijk handelen volgens

Nadere informatie

Cycling in The Netherlands & The Hague

Cycling in The Netherlands & The Hague Cycling in The Netherlands & The Hague Inge Molenaar program manager for cycling City of The Hague Ottawa, december 2009 A few words about me Facts and points of interest about the municipality of the

Nadere informatie

Issues in PET Drug Manufacturing Steve Zigler PETNET Solutions April 14, 2010

Issues in PET Drug Manufacturing Steve Zigler PETNET Solutions April 14, 2010 Issues in PET Drug Manufacturing Steve Zigler PETNET Solutions April 14, 2010 Topics ANDA process for FDG User fees Contract manufacturing PETNET's perspective Colleagues Michael Nazerias Ken Breslow Ed

Nadere informatie

Feedback WG System Operations 21 November 2012

Feedback WG System Operations 21 November 2012 Feedback WG System Operations 21 November 2012 User Group 06/12/2012 Wim Michiels Content Feedback IGCC Winter action plan Draft ENTSO-E winter outlook 2012 2013 Capaciteit noordgrens Overview of dynamic

Nadere informatie

Ghent Climate Proof City 2030

Ghent Climate Proof City 2030 Ghent Climate Proof City 2030 Maaike Breugelmans Environmental and Climate Service City of Ghent May 2015 Maaike Breugelmans Stad Gent Dienst Stedenbouw en Ruimtelijke Planning INTRODUCTION Geographical

Nadere informatie

ASTRIN Lighting Interoperability Standard Het ALiS Protocol in de praktijk

ASTRIN Lighting Interoperability Standard Het ALiS Protocol in de praktijk ASTRIN Lighting Interoperability Standard Het ALiS Protocol in de praktijk ALiS Foundation Introductie Henk Walraven, voorzitter bestuur Gertjan Eg, directeur Ruben van Bochove, voorzitter Raad van Advies

Nadere informatie

For Sale & For Rent Gerdesiaweg Rotterdam-Kralingen, the Netherlands

For Sale & For Rent Gerdesiaweg Rotterdam-Kralingen, the Netherlands For Sale & For Rent Gerdesiaweg 486-488 Rotterdam-Kralingen, the Netherlands Asking price: 1.100.000 k.k. Rental price: 95.000 per year www.reliplan.nl 2. Object Location The location is situated at Gerdesiaweg

Nadere informatie

Fidelity of a Strengths-based method for Homeless Youth

Fidelity of a Strengths-based method for Homeless Youth Fidelity of a Strengths-based method for Homeless Youth Manon krabbenborg, Sandra Boersma, Marielle Beijersbergen & Judith Wolf s.boersma@elg.umcn.nl Homeless youth in the Netherlands Latest estimate:

Nadere informatie

Bemalen en monumenten voorkomen van schade

Bemalen en monumenten voorkomen van schade Bemalen en monumenten voorkomen van schade B E M A L E N, M O N U M E N T E N E N D E N O O R D / Z U I D L I J N : E E N B I J Z O N D E R E C O M B I N A T I E E E N K W E S T I E V A N K E N N I S &

Nadere informatie

Digital municipal services for entrepreneurs

Digital municipal services for entrepreneurs Digital municipal services for entrepreneurs Smart Cities Meeting Amsterdam October 20th 2009 Business Contact Centres Project frame Mystery Shopper Research 2006: Assessment services and information for

Nadere informatie

Agenda: Rotary Industry Group

Agenda: Rotary Industry Group KiC MPI 21juni 2018 Rotary Industry Group Agenda: a) Korte introductie: wie zijn wij wat doen wij? b) Nieuwe ontwikkelingen binnen Rotary Industry Group c) Contactloze magnetische koppeling d) Business

Nadere informatie

Continuous testing in DevOps met Test Automation

Continuous testing in DevOps met Test Automation Continuous ing in met Continuous testing in met Marco Jansen van Doorn Tool Consultant 1 is a software development method that emphasizes communication, collaboration, integration, automation, and measurement

Nadere informatie

TE HUUR STAMMERHOVE 13 DIEMEN COLLIERS INTERNATIONAL REAL ESTATE B.V. TE HUUR STAMMERHOVE 13 - DIEMEN

TE HUUR STAMMERHOVE 13 DIEMEN COLLIERS INTERNATIONAL REAL ESTATE B.V. TE HUUR STAMMERHOVE 13 - DIEMEN TE HUUR STAMMERHOVE 13 DIEMEN COLLIERS INTERNATIONAL REAL ESTATE B.V. TE HUUR STAMMERHOVE 13 - DIEMEN Accelerating success COLLIERS INTERNATIONAL REAL ESTATE B.V. TE KOOP/ TE HUUR ADRES - PLAATS OPPERVLAKTE

Nadere informatie

TE HUUR MOLENWERF AMSTERDAM COLLIERS INTERNATIONAL REAL ESTATE B.V. TE HUUR MOLENWERF AMSTERDAM

TE HUUR MOLENWERF AMSTERDAM COLLIERS INTERNATIONAL REAL ESTATE B.V. TE HUUR MOLENWERF AMSTERDAM TE HUUR MOLENWERF 10-24 AMSTERDAM COLLIERS INTERNATIONAL REAL ESTATE B.V. TE HUUR MOLENWERF 10-24 AMSTERDAM Accelerating success COLLIERS INTERNATIONAL REAL ESTATE B.V. TE KOOP/ TE HUUR ADRES - PLAATS

Nadere informatie

HOPE UNIVERSITY COLLEGE ADDIS ABABA ETHIOPIA

HOPE UNIVERSITY COLLEGE ADDIS ABABA ETHIOPIA HOPE UNIVERSITY COLLEGE ADDIS ABABA ETHIOPIA Service Centre Classroom 1 Management Faculty Multi Purpose Hall Classroom 2 Library Sport Staff Residence PROGRESS REPORT Page 1 of 9 Project : Construction

Nadere informatie

Opportunities for Collaborative Interdisciplinary Programs. James W. Jones Director, FCI

Opportunities for Collaborative Interdisciplinary Programs. James W. Jones Director, FCI Opportunities for Collaborative Interdisciplinary Programs James W. Jones Director, FCI Outline Introduction: Motivation for the FCI Ongoing Projects Mechanisms Emerging Needs, Opportunities Closing Remarks

Nadere informatie

B2Ai Human Centered Architecture

B2Ai Human Centered Architecture B2Ai Human Centered Architecture Human centered Office for Human centered Architecture Multidisciplinar Schools architecture group Corporate Health & Care Culture Residential 120 people Leisure B2Ai Our

Nadere informatie

Talentmanagement in tijden van crisis

Talentmanagement in tijden van crisis Talentmanagement in tijden van crisis Drs. Bas Puts Page 1 Copyright Siemens 2009. All rights reserved Mission: Achieving the perfect fit Organisatie Finance Sales Customer Engineering Project management

Nadere informatie

OVERZICHT VAN VISUALISATIES

OVERZICHT VAN VISUALISATIES CONRAD KICKERT INTRODUCTIE Deze visualisaties zijn gemaakt voor professionele en academische projecten in de afgelopen vijf jaar. De mix van regionale conceptdiagrammen, stedenbouwkundige plankaarten en

Nadere informatie

Business as an engine for change.

Business as an engine for change. Business as an engine for change. In the end, the success of our efforts will be measured against how we answered what we have found to be the fundamental question: how do we love all the children, of

Nadere informatie

9811 Borneodriehoek, Amsterdam Borneotriangle, Amsterdam

9811 Borneodriehoek, Amsterdam Borneotriangle, Amsterdam 9811 Borneodriehoek, Amsterdam 9811 Borneotriangle, Amsterdam photo: Dok architects ruimtelijk Spacious locatie: Indische buurt, Amsterdam Op vier plaatsen in de negentiende eeuwse Indische Buurt is vervangende

Nadere informatie

International Leiden Leadership Programme

International Leiden Leadership Programme International Leiden Leadership Programme Information Evening 1 November 2016 Universiteit Leiden.. LLP Programme team Menno Mennes Lucille Brakefield Janna van Helden Ratna Lachmansingh Programme Bij

Nadere informatie

P U B L I C A T I E S CRUX Engineering BV

P U B L I C A T I E S CRUX Engineering BV www.cruxbv.nl Pagina 1 P U B L I C A T I E S CRUX Engineering BV 2004 Monitoren van betonconstructie; StUFIB rapport studiecel 154, mei 2004 ( i.s.m. J.Walraven, C.van der Veen; R. Polder, J. Gullikers,

Nadere informatie

Best Practise: Car Parks in Leiden Drs. Ing. J.N. de Koning

Best Practise: Car Parks in Leiden Drs. Ing. J.N. de Koning Best Practise: Car Parks in Leiden Drs. Ing. J.N. de Koning 1 Introduction drs.ing. J.N. (Jaap) de Koning: Consultant contracting and procurement at Witteveen+Bos; Manager Almere office; Chair Platform

Nadere informatie

Fortifications of Antwerp

Fortifications of Antwerp Fortifications of Antwerp Policy on a regional level Wim Lux Head of Department Spatial Planning and Mobility Province of Antwerp - Belgium Fort 1 Wijnegem Demolished 1959 Redoubt Puurs Local recreation

Nadere informatie

How will be the journey from corrective maintenance to preventive or even predictive maintenance?

How will be the journey from corrective maintenance to preventive or even predictive maintenance? How will be the journey from corrective maintenance to preventive or even predictive maintenance? Corporate movie Bakker Repair.mp4 Ton Klinkenberg Managing Director ton.klinkenberg@bakker-repair.nl Introduction

Nadere informatie

Introduction Henk Schwietert

Introduction Henk Schwietert Introduction Henk Schwietert Evalan develops, markets and sells services that use remote monitoring and telemetry solutions. Our Company Evalan develops hard- and software to support these services: mobile

Nadere informatie

Dutch Construction Contracts: views from abroad

Dutch Construction Contracts: views from abroad Dutch Construction Contracts: views from abroad Dutch Construction Contracts: views from abroad Editor prof. mr. dr. M.A.B. Chao-Duivis With special thanks to: Ministry of the Interior and Kingdom Relations

Nadere informatie

Developments in SWAT modelling

Developments in SWAT modelling Developments in SWAT modelling Erik Querner Environmental Modelling SWAT model SWAT use in the Limpopo basin > SWAT CUP New developments: Link SIMGRO SWAT Rainfall runoff module for shallow groundwater

Nadere informatie

Aim of this presentation. Give inside information about our commercial comparison website and our role in the Dutch and Spanish energy market

Aim of this presentation. Give inside information about our commercial comparison website and our role in the Dutch and Spanish energy market Aim of this presentation Give inside information about our commercial comparison website and our role in the Dutch and Spanish energy market Energieleveranciers.nl (Energysuppliers.nl) Founded in 2004

Nadere informatie

Laboratory report. Independent testing of material surfaces. Analysis of leaching substances in treated wood samples conform guide line EU 10/2011

Laboratory report. Independent testing of material surfaces. Analysis of leaching substances in treated wood samples conform guide line EU 10/2011 Independent testing of material surfaces Laboratory report Analysis of leaching substances in treated wood samples conform guide line EU 10/2011 Customer Wasziederij De Vesting BV Trasweg 12 5712 BB Someren-Eind

Nadere informatie

Opleiding PECB IT Governance.

Opleiding PECB IT Governance. Opleiding PECB IT Governance www.bpmo-academy.nl Wat is IT Governance? Information Technology (IT) governance, ook wel ICT-besturing genoemd, is een onderdeel van het integrale Corporate governance (ondernemingsbestuur)

Nadere informatie

Zuiveren met verstand. RFID tags als verklikkers in de afvalwaterzuivering. S.A.C. (Saskia) Hanneman Innovatietechnoloog Waterschapsbedrijf Limburg

Zuiveren met verstand. RFID tags als verklikkers in de afvalwaterzuivering. S.A.C. (Saskia) Hanneman Innovatietechnoloog Waterschapsbedrijf Limburg Zuiveren met verstand RFID tags als verklikkers in de afvalwaterzuivering S.A.C. (Saskia) Hanneman Innovatietechnoloog Waterschapsbedrijf Limburg Zuiveren met verstand - inhoud WwTP Simpelveld Plant setup

Nadere informatie

Patiëntenparticipatie in

Patiëntenparticipatie in Patiëntenparticipatie in Europees perspectief Marleen Kaatee Oprichter & voorzitter Patiëntenparticipatie in Europa: 1. PSC Patients Europe 2. EMA 3. ERNs, European Reference Networks Noodzaak: internationaal

Nadere informatie

Safe production of Marine plants and use of Ocean Space. 2de Nederlands-Belgische Zeewierconferentie: DE MULTIFUNCTIONELE NOORDZEE

Safe production of Marine plants and use of Ocean Space. 2de Nederlands-Belgische Zeewierconferentie: DE MULTIFUNCTIONELE NOORDZEE Safe production of Marine plants and use of Ocean Space 2de Nederlands-Belgische Zeewierconferentie: DE MULTIFUNCTIONELE NOORDZEE Waarom dit project? De 2050 Challenge 2050: 10 billion people Voedsel Water

Nadere informatie

Adventures in GIS to Support LEED Certification. Karen Jordan

Adventures in GIS to Support LEED Certification. Karen Jordan Adventures in GIS to Support LEED Certification Karen Jordan Agenda University of California Office of the President commitment to Campus Sustainability through the Green Building Policy & Clean Energy

Nadere informatie

SHP-TS TwinArc SA SHP-TS 400W TWINARC E40 SL PRODUCT OVERVIEW

SHP-TS TwinArc SA SHP-TS 400W TWINARC E40 SL PRODUCT OVERVIEW Range Features Range of high pressure sodium lamps with double arc tube construction Dual arc tube design guarantees immediate re-strike after a power interruption Doubled lamp life and reduced occurrence

Nadere informatie

Gebruik van GRI-indicatoren voor interne sturingsprocessen. Mark van Rijn 14 October 2004

Gebruik van GRI-indicatoren voor interne sturingsprocessen. Mark van Rijn 14 October 2004 Gebruik van GRI-indicatoren voor interne sturingsprocessen Mark van Rijn 14 October 2004 Een jaar geleden... Heineken verwijderd uit DJSI STOXX Positie binnen FTSE4Good onder druk Heineken scoort laag

Nadere informatie

Betekenis nieuwe GRI - Richtlijnen. Rob van Tilburg Adviesgroep duurzaam ondernemen DHV Utrecht, 23 November 2006

Betekenis nieuwe GRI - Richtlijnen. Rob van Tilburg Adviesgroep duurzaam ondernemen DHV Utrecht, 23 November 2006 Betekenis nieuwe GRI - Richtlijnen Rob van Tilburg Adviesgroep duurzaam ondernemen DHV Utrecht, 23 November 2006 Opbouw presentatie 1. Uitgangspunten veranderingen G2 - > G3 2. Overzicht belangrijkste

Nadere informatie

Building with Nature in the Delta. Inzetten van natuur en natuurlijke processen voor medegebruik

Building with Nature in the Delta. Inzetten van natuur en natuurlijke processen voor medegebruik Building with Nature in the Delta Inzetten van natuur en natuurlijke processen voor medegebruik april 24, 2015 Ministry of Infrastructure and the Environment endorses BWN 26-04-2013 Minister Schultz van

Nadere informatie

What issues should the Province of Limburg address when developing its climate-proof policy?

What issues should the Province of Limburg address when developing its climate-proof policy? Figuur 1.1: Waar moet de Provincie Limburg klimaatadaptatiebeleid voor ontwikkelen? inhoudelijk Huidig beleid Gevolgen klimaatverandering Witte vlekken procesmatig Aansluiting ander beleid Rol provincie

Nadere informatie

Prove Everything or Die. Presentatie meetbaarheid Woensdag 9 mei 2012 Robin den Hoed

Prove Everything or Die. Presentatie meetbaarheid Woensdag 9 mei 2012 Robin den Hoed Prove Everything or Die Presentatie meetbaarheid Woensdag 9 mei 2012 Robin den Hoed Een stelling Met een PR- budget van 20.000 hebben we een mediawaarde gerealiseerd van 60.000 en 500 nieuwe fans op Facebook

Nadere informatie

Reykjavikweg 2 SCHIPHOL ZUIDOOST

Reykjavikweg 2 SCHIPHOL ZUIDOOST Reykjavikweg 2 SCHIPHOL ZUIDOOST INFORMATION WITHOUT OBLIGATION Project: Office space at a perfect location in Cargo World Schiphol (Schiphol Southeast). Location: The complex is situated at the south

Nadere informatie

ARTIST. Petten 24 September 2012. www.ecn.nl More info: schoots@ecn.nl

ARTIST. Petten 24 September 2012. www.ecn.nl More info: schoots@ecn.nl ARTIST Assessment and Review Tool for Innovation Systems of Technologies Koen Schoots, Michiel Hekkenberg, Bert Daniëls, Ton van Dril Agentschap NL: Joost Koch, Dick Both Petten 24 September 2012 www.ecn.nl

Nadere informatie

Zutphen Groenmarkt >>>

Zutphen Groenmarkt >>> Zutphen Groenmarkt >>> Zutphen Groenmarkt project public space refurbishment Groenmarkt square & Marspoortstraat (street) location Zutphen designers Ronald Bron Marike Oudijk Mark van Rijnberk partners

Nadere informatie

Innovatie door samenwerken - Slim gebruik maken van de aanwezige informatievoorziening - September 2014

Innovatie door samenwerken - Slim gebruik maken van de aanwezige informatievoorziening - September 2014 Innovatie door samenwerken - Slim gebruik maken van de aanwezige informatievoorziening - September 2014 Wladimir Moen Director Business Development wmoen@agtinternational.com 0031 6 31 95 48 77 A leader

Nadere informatie

TE HUUR EMMASINGEL EINDHOVEN

TE HUUR EMMASINGEL EINDHOVEN TE HUUR EMMASINGEL 33-35 EINDHOVEN Accelerating success. PROJECT OMSCHRIJVING DE EMMA In september 2016 is het startschot gegeven voor de grootschalige revitalisatie van het kantoorgebouw De Emma gelegen

Nadere informatie

Make a smart move+ WIJCHEN LOGISTICS CENTRE m 2 BEDRIJFSRUIMTE TE HUUR IN-HOUSE TECHNISCH EN VASTGOEDBEHEER AANTREKKELIJKE HUURVOORWAARDEN

Make a smart move+ WIJCHEN LOGISTICS CENTRE m 2 BEDRIJFSRUIMTE TE HUUR IN-HOUSE TECHNISCH EN VASTGOEDBEHEER AANTREKKELIJKE HUURVOORWAARDEN Make a smart move+ STRATEGISCHE LOCATIE,, A326 AANTREKKELIJKE HUURVOORWAARDEN IN-HOUSE TECHNISCH EN VASTGOEDBEHEER 25.500 m 2 BEDRIJFSRUIMTE TE HUUR WIJCHEN LOGISTICS CENTRE MODERNE LOGISTIEKE BEDRIJFSRUIMTE

Nadere informatie

End-to-End testen: de laatste horde

End-to-End testen: de laatste horde End-to-End testen: de laatste horde Dieter Arnouts Agenda Begrip End-to-End testen in het test proces Praktische aanpak End-to-End Test Omgeving Uitdagingen End-to-End testen: De laatste horde 11/10/2010

Nadere informatie

SURFnet User Survey 2006

SURFnet User Survey 2006 SURFnet User Survey 2006 Walter van Dijk Madrid, 21 September 2006 Agenda A few facts General picture resulting from the survey Consequences for the service portfolio Consequences for the yearly innovation

Nadere informatie

Lelystad, Mainport Park A6

Lelystad, Mainport Park A6 Lelystad, Mainport Park A6 kavels vanaf 0,5 tot 21 hectare building plots as of 5,000 up 21 hectares 100% bebouwbaar site coverage 100% direct aan luchthaven directly linked to airport centraal in Nederland

Nadere informatie

STORM Groep b.v. We will get there in time

STORM Groep b.v. We will get there in time STORM Groep b.v. We will get there in time info@stormconnect.nl info@stormenginesandparts.nl +31(0)180-512097 info@stormsafetyservices.nl info@stormserviceandtrading.nl +31(0)180-518321 stormconnect.nl

Nadere informatie

Cateringweg 10, Schiphol

Cateringweg 10, Schiphol Cateringweg 10, Schiphol INFORMATION WITHOUT OBLIGATION Project: Multifunctional office-, warehouse space with a big parking place on Schiphol. Location: Schiphol close to to N232 and highways A4, A9 and

Nadere informatie

Business Architectuur vanuit de Business

Business Architectuur vanuit de Business Business Architectuur vanuit de Business CGI GROUP INC. All rights reserved Jaap Schekkerman _experience the commitment TM Organization Facilities Processes Business & Informatie Architectuur, kun je vanuit

Nadere informatie

underground container systems metro, chiplock and winconsyst

underground container systems metro, chiplock and winconsyst underground container systems metro, chiplock and winconsyst vconsyst VConsyst specialises in manufacturing and exporting underground waste collection systems. With twenty years of experience and an installed

Nadere informatie

Open source VoIP Networks

Open source VoIP Networks Open source VoIP Networks Standard PC hardware inexpensive add-in vs. embedded designs Ing. Bruno Impens Overview History Comparison PC - Embedded More on VoIP VoIP Hardware VoIP more than talk More...

Nadere informatie

Kwalitatieve Studie naar Motivatie en Barrières van Etnische Minderheden uit Amsterdam

Kwalitatieve Studie naar Motivatie en Barrières van Etnische Minderheden uit Amsterdam Kwalitatieve Studie naar Motivatie en Barrières van Etnische Minderheden uit Amsterdam Zuidoost om zich bij de Soa-polikliniek van de GGD Amsterdam te laten Testen op Soa s en Hiv A Qualitative Research

Nadere informatie

Developing an adaptive, diagnostic test of. English writing skills

Developing an adaptive, diagnostic test of. English writing skills Developing an adaptive, diagnostic test of English writing skills Development of the DET Objectives Consultation IT Student model Consultation External committee Research Student models Psychometric Automatic

Nadere informatie

Risk & Requirements Based Testing

Risk & Requirements Based Testing Risk & Requirements Based Testing Tycho Schmidt PreSales Consultant, HP 2006 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice Agenda Introductie

Nadere informatie

Big Data en Testen samen in een veranderend speelveld. Testnet 10 april 2014 Paul Rakké

Big Data en Testen samen in een veranderend speelveld. Testnet 10 april 2014 Paul Rakké Big Data en Testen samen in een veranderend speelveld Testnet 10 april 2014 Paul Rakké Kernvraag Is het testen van Big Data omgevingen, applicaties en de data anders dan het testen van meer traditionele

Nadere informatie

FOD VOLKSGEZONDHEID, VEILIGHEID VAN DE VOEDSELKETEN EN LEEFMILIEU 25/2/2016. Biocide CLOSED CIRCUIT

FOD VOLKSGEZONDHEID, VEILIGHEID VAN DE VOEDSELKETEN EN LEEFMILIEU 25/2/2016. Biocide CLOSED CIRCUIT 1 25/2/2016 Biocide CLOSED CIRCUIT 2 Regulatory background and scope Biocidal products regulation (EU) nr. 528/2012 (BPR), art. 19 (4): A biocidal product shall not be authorised for making available on

Nadere informatie

Support Center GIS-Flanders

Support Center GIS-Flanders Support Center GIS-Flanders Our mission: Ensuring the optimal use of geographic information in Flanders Het Ondersteunend Centrum GIS-Vlaanderen is

Nadere informatie

[ ] OVER ASCOM HARRY WASSENS, SALES DIRECTOR. Over Ascom Harry Wassens 13-10-11 Ascom (Nederland) B.V.

[ ] OVER ASCOM HARRY WASSENS, SALES DIRECTOR. Over Ascom Harry Wassens 13-10-11 Ascom (Nederland) B.V. [ ] OVER ASCOM HARRY WASSENS, SALES DIRECTOR 1 ASCOM Ascom employs about 2.300 people worldwide Ascom has subsidiaries in 20 countries In H1/2011 Ascom generated revenues of 253.1 MCHF with an EBITDA margin

Nadere informatie

Stephanie van Dijck De integrale aanpak maakt complexiteit hanteerbaar

Stephanie van Dijck De integrale aanpak maakt complexiteit hanteerbaar Titel, samenvatting en biografie Stephanie van Dijck De integrale aanpak maakt complexiteit hanteerbaar Samenvatting: Nieuwe projecten nemen toe in complexiteit: afhankelijkheden tussen software componenten,

Nadere informatie

Report for D-Sheet Piling 9.2

Report for D-Sheet Piling 9.2 Report for D-Sheet Piling 9.2 Design of Sheet Pilings Developed by Deltares Company: RPS advies en ingenieurs bv Date of report: 10/2/2013 Time of report: 4:03:39 PM Date of calculation: 10/2/2013 Time

Nadere informatie

Topic 10-5 Meeting Children s Intellectual Needs

Topic 10-5 Meeting Children s Intellectual Needs Topic 10-5 Meeting Children s Intellectual Needs In this topic, you will learn how to help children develop the ability to reason and use complex thought, as well as The role of play in intellectual development

Nadere informatie

University of Groningen Educational value of digital examination

University of Groningen Educational value of digital examination University of Groningen Educational value of digital examination Benefits Digital Examination HANDWRITING CORRECTING 1 2 3 Do you remember the Correcting the essay exams in handwriting from your students

Nadere informatie

Smart Mobility. Marije de Vreeze Connekt / ITS

Smart Mobility. Marije de Vreeze Connekt / ITS Smart Mobility Marije de Vreeze Connekt / ITS Netherlands Samenleving verandert Business modellen veranderen Klimaatverandering Bron: Nico Larco, 2018 Bron: Nico Larco, 2018 Waarom? Economy Accessibility

Nadere informatie

Mounting ceiling & wall

Mounting ceiling & wall 5 / profile 34 bending radius R 15*) (1015) R 20 (1015) R 30 (1015) R>80 (1018) filler position profile 26 bending radius filler position R 15*) (1015) R 25 (1015) R>100 (1018) 28 15 405 gr/m 522 gr/m

Nadere informatie

Creating a marketplace where expertise is made available through videoconferencing. Roland Staring Community Support Manager roland.staring@surfnet.

Creating a marketplace where expertise is made available through videoconferencing. Roland Staring Community Support Manager roland.staring@surfnet. Expert at a distance Creating a marketplace where expertise is made available through videoconferencing Roland Staring Community Support Manager roland.staring@surfnet.nl Working together for education

Nadere informatie

9301 Oldenelerbroek, Zwolle Oldenelerbroek, Zwolle

9301 Oldenelerbroek, Zwolle Oldenelerbroek, Zwolle 9301, 9301, 9301, 9301, OLDENELERBROEK OLDENELERBROEK locatie: programma: 28 Grondgebonden woningen b.v.o.: m2 architect: Liesbeth van der Pol Het landschap langs de IJssel wordt gekarakteriseerd door

Nadere informatie

WP6 TenCompetence Assessment Specification v.1.0 and Proof-of-concept tools. Milen Petrov, Sofia University EDE 2007, 10-2007

WP6 TenCompetence Assessment Specification v.1.0 and Proof-of-concept tools. Milen Petrov, Sofia University EDE 2007, 10-2007 WP6 TenCompetence Assessment Specification v..0 and Proof-of-concept tools Milen Petrov, Sofia University EDE 2007, 0-2007 WP6 Internal Structure T3: Assessment Model connected with T: Units of Learning

Nadere informatie

Dutch Research Council: women in scientific careers

Dutch Research Council: women in scientific careers Dutch Research Council: women in scientific careers Dr. Wilma van Donselaar Paris 2005 What is NWO? NWO is the Dutch Research Council and consists of 8 councils: Humanities, Social Sciences, Medical Sciences,

Nadere informatie

SMART(ER) GATES Multi use and multi functional HUB s. ADVIER Mobiliseert, NIO Architecten en OKRA landschapsarchitecten

SMART(ER) GATES Multi use and multi functional HUB s. ADVIER Mobiliseert, NIO Architecten en OKRA landschapsarchitecten SMART(ER) GATES Multi use and multi functional HUB s ADVIER Mobiliseert, NIO Architecten en OKRA landschapsarchitecten Background and team Contest City of Antwerp design contest for parking houses (P+R

Nadere informatie

SAMPLE 11 = + 11 = + + Exploring Combinations of Ten + + = = + + = + = = + = = 11. Step Up. Step Ahead

SAMPLE 11 = + 11 = + + Exploring Combinations of Ten + + = = + + = + = = + = = 11. Step Up. Step Ahead 7.1 Exploring Combinations of Ten Look at these cubes. 2. Color some of the cubes to make three parts. Then write a matching sentence. 10 What addition sentence matches the picture? How else could you

Nadere informatie

0515 FOREIGN LANGUAGE DUTCH

0515 FOREIGN LANGUAGE DUTCH UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS International General Certificate of Secondary Education MARK SCHEME for the May/June 2010 question paper for the guidance of teachers 0515 FOREIGN LANGUAGE

Nadere informatie

0515 DUTCH (FOREIGN LANGUAGE)

0515 DUTCH (FOREIGN LANGUAGE) UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS International General Certificate of Secondary Education MARK SCHEME for the May/June 2011 question paper for the guidance of teachers 0515 DUTCH (FOREIGN

Nadere informatie

STRESS CORROSION CRACKING OF WELDED JOINTS OF Al-Mg ALLOYS

STRESS CORROSION CRACKING OF WELDED JOINTS OF Al-Mg ALLOYS Journal of KONES Powertrain and Transport, Vol. 21, No. 3 2014 ISSN: 1231-4005 e-issn: 2354-0133 ICID: 1133154 DOI: 10.5604/12314005.1133154 STRESS CORROSION CRACKING OF WELDED JOINTS OF Al-Mg ALLOYS Gdynia

Nadere informatie

Profile visitors NRC Q

Profile visitors NRC Q NRC Media presents About NRC Q A unique concept Business news platform for ambitious people on the go Short, sharp articles with professional infographics Daily newsletter at 5.30am News updates via WhatsApp

Nadere informatie

Utch PO. Net innovations Dutch demersal fleet. Urk, 1 October 2015 Durk van Tuinen Cooperative Fisheries Organization

Utch PO. Net innovations Dutch demersal fleet. Urk, 1 October 2015 Durk van Tuinen Cooperative Fisheries Organization Utch PO European Fisheries Fund: Investing in Sustainable Fisheries Net innovations Dutch demersal fleet Urk, 1 October 2015 Durk van Tuinen Cooperative Fisheries Organization European Fisheries Fund:

Nadere informatie

Engineering Services for Additional Studies and Technical Assistance for New Locks PANAMA

Engineering Services for Additional Studies and Technical Assistance for New Locks PANAMA Engineering Services for Additional Studies and Technical Assistance for New Locks PANAMA Study and 3D modelling of density and discharge currents of the third set of locks CEDA presentation 19 May 2011

Nadere informatie

Enable all people to travel by plane

Enable all people to travel by plane Enable all people to travel by plane 3 Transavia from the air Enable all people to travel (by plane) Accessible, friendly, unforgetable Passenger experience index 74 Fuel 381 mln liters 104 destinations

Nadere informatie

Figure 1 Shares of Students in Basic, Middle, and Academic Track of Secondary School Academic Track Middle Track Basic Track 29 Figure 2 Number of Years Spent in School by Basic Track Students 9.5 Length

Nadere informatie

0021 Brede School, Amsterdam - Osdorp Community School, Amsterdam - Osdorp

0021 Brede School, Amsterdam - Osdorp Community School, Amsterdam - Osdorp 0021 Brede School, Amsterdam - Osdorp 0021 Community School, Amsterdam - Osdorp Photo: Arjen Schmitz DE KIKKER THE FROG locatie: Evertsweertplantsoen, Amsterdam Twee basisscholen, een Kinderdagverblijf

Nadere informatie