Technical feasibility of a demountable floating body for a demountable stadium.

Maat: px
Weergave met pagina beginnen:

Download "Technical feasibility of a demountable floating body for a demountable stadium."

Transcriptie

1 Appendices Technical feasibility of a demountable floating body for a demountable stadium. J.J. Timmers Master s Thesis June 2013

2

3

4

5 CONTENTS... 3 CONTENTS FLOATING STRUCTURES PONTOONS HOUSING OFFSHORE BRIDGES AND ROADS STUDIES STADIUMS DEMOUNTABLE STADIUMS FLOATING STADIUMS STUDIES CONNECTIONS FLEXIFLOAT HANN OCEAN PONTOON CONNECTION TEKLOCK SYSTEM TENSIONING TOOTH CONNECTION LOADS LOAD FACTORS IMPOSED LOAD WIND LOAD SNOW LOAD WAVE LOAD STATIC STABILITY HYDROSTATIC PRESSURE BUOYANCY TILT STATIC STABILITY SPRING SUPPORTED BEAM POINT LOAD BEAMS WITH A FINITE LENGTH DYNAMIC STABILITY MOVEMENTS ASSUMPTIONS HEAVE MOTION ROLL & PITCH MOTION WAVES WIND WAVES OBSTACLES FORCES BY WAVES TRANSPORTATION TRANSPORTATION BY SHIPS TRANSPORTATION BY ROAD TRANSPORTATION BY TRAIN LEGISLATION NTA DRIJVEND BOUWEN EUROCODE REALISED FLOATING PROJECTS FLOATING PAVILION FLOATING GREENHOUSE NAALDWIJK FLOAT MARINA BAY INTERVIEW RUTGER DE GRAAF (DELTASYNC) LITERATURE LIST OF FIGURES... 67

6

7 Floating Structures 1. FLOATING STRUCTURES There are a lot of technologies to create a floating surface. In this chapter the most important and interesting ones will be described. A separation is made between the different systems and companies of the floating elements Pontoons Steel pontoons are often used for temporary stages, floating working surfaces and even as terraces. The structure is very simple mostly it is a box filled with air and some stiffeners. There are a lot of manufactures and rental companies, so only a quick overview is given about steel pontoons Hann-Ocean The Hann-Ocean company offers different kind of steel and concretesteel pontoons. These pontoons can be used for a lot functions. Two different pontoons will be described. Containerized pontoons Containerized pontoons are used for floating cranes, performance stages, houses and many other functions. The pontoons have the measurements like an ISO freight container (TEU) and can be handled like that. The connections between the pontoons are described in chapter 3.1. The dimensions and design capacity can be found in Figure 1. Note: feet instead of metres. Figure 1 Containerized pontoons [Hann-Ocean] Concrete steel composite pontoons Concrete steel composite pontoons are steel pontoons with concrete layers on every side. By doing this the lifespan will increase. Floating houses, jetties and breakwaters are functions which can be fulfilled by the concrete steel pontoons. Due to the concrete layer the maximum deck load decreases but they will be less wobble in rough water. The properties are shown in Figure 2. Figure 2 Concrete steel pontoons [Hann-Ocean] 1

8 Floating Structures Flexifloat The Flexifloat construction system is a combination of portable, interlocking modular barges and auxiliary attachments, which are used in inland marine and heavy construction applications. All components of the sectional barge system are portable and are designed for road transport by standard highway trucks and trailers. Flexifloat can be quickly connected into larger assemblies of various sizes and shapes by ordinary work crews without the need for special tools or equipment. The resulting platforms are capable of supporting all types of heavy equipment loads in areas that are practically or economically inaccessible to conventional deck barges. (Flexifloat) 2 The pontoons are made from steel and are especially designed for shallow water and inland environments. The modules can be easily transported by truck and the pontoons have a single lifting point. Therefore the handling by crane is simple. The pontoons are mainly for temporary use. The Flexifloat pontoons has its own connection system, this system is described in chapter 3.1. Some specifications of a Flexifloat pontoon are shown in Figure 3 Flexifloat S-70 pontoon, note the units. Figure 3 Flexifloat S-70 pontoon [Flexifloat] MPS B.V. Modular Pontoon Systems is a Dutch company in Aalst. MPS is a manufacturer of container pontoons. Their modular system is based on a patented coupling system, see chapter 3.4, and their design of steel pontoons. The pontoons are designed and certified for use on inland waterways and coastal areas. (MPS bv). the applications of the pontoons are numerous and are the same as for the other pontoons types. Some specifications of a container pontoon can be seen at Figure 4. In Figure 5 it is clear to see how a steel pontoon can be transported by a truck.

9 Floating Structures The caisson is mostly made of concrete. This results in a high selfweight and a large draught. As a results there is not a high buoyancy capacity left for the building which is placed upon the caisson. A concrete caisson is a very stable design because it has a low centre of gravity due to the weight, which is very beneficial for the stability. Figure 4 MPS 40' Pontoon [MPS bv] Advantages - Widely used - Stabile - Cheap - Space in the caisson can be used Disadvantages - High self-weight results in large draught - Sinkable - Little buoyant capacity Figure 5 Transport by truck [mm] 1.2. Housing Closed caisson A floating concrete caisson is mostly a square container see Figure 6. Up on this caisson the building is placed. The caisson is a closed body but the space inside the caisson can be used for several functions like a living floor. Large caissons have sometimes inner walls because the hydrostatic pressure can cause large bending moments in the bottom slab of the caissons. Besides that it also creates partitions in the caisson this is beneficial in case of leakage, only one or several compartments will then be filled with water instead of the whole caisson. Figure 6 Closed caisson [Koekoek] 3

10 Floating Structures Open caisson An open caisson is comparable with the closed variant, see Figure 7. In the open variant the top slab is removed. This will reduce the weight and the draught of the caisson. By removing the top slab also the centre of gravity will be lower, this will improve the stability. The walls of the building are placed on the wall of the caisson. This system is used for almost every barge (woonboot) because is relatively cheap. The largest building built with this system is the detention centrum in Zaandam. The floating foundation is 100 meters long and 22 meters wide. (Cement and Graaf). The biggest disadvantage of this system is the depth, for a normal house the draught is usually 1.5 meters. (Graaf). Most waters in Netherlands are very shallow the depth varies from 1 to 1.5 meters. The same advantages and disadvantages hold for the open caisson as for the closed caisson but the disadvantages about self-weight and buoyant capacity are less present. Advantages - Widely used - Stabile - Cheap - Space in the caisson can be used Disadvantages - High self-weight results in large draught - Sinkable - Little buoyant capacity Pneumatic caisson The pneumatic caisson has no bottom slab, see Figure 8. The buoyant force comes from the compressed air between the water and the caisson. The buoyant force is lower than an open caisson with the same dimensions because the displacement of water is less. Because this variant has no bottom slab the centre of gravity is on a higher place that makes this variant less stable. It is a risky system, if the compressed air escapes the caissons sinks. Actually this system is not often used for floating buildings but for other functions, like tunnels. Figure 8 Pneumatic caisson [Koekoek] Caisson filled with EPS In this variant the caisson is filled with polystyrene foam blocks. These EPS blocks have a low weight so the caisson has lower draught and a higher buoyant force. Besides this advantage the caisson cannot sink anymore because the caisson is filled. For the same reason the thickness of the walls and slabs will become smaller. 4 Figure 7 Open caisson [Koekoek] This variant is often used in Canada and is in the Netherlands adopted by Ooms bouwmaatschappij. In het 1980 s the Canadian company International Marina Floatation Systems Inc. (IMF) started constructing houses and other buildings with EPS and concrete. The concrete around the EPS blocks contribute to the stiffness en structural unity of the floating body. (wonenopwater).

11 Floating Structures On Figure 9 the construction method is clearly explained. First a concrete floor will be made when the floor is ready the EPS-blocks are put together to made a core of EPS blocks. The third step is to wrap the EPS core with reinforcement. This reinforcement is needed for the concrete walls and top floor. In the next steps the formwork will be placed and the concrete poured. When the formwork is removed the floating body is ready to build a house on top of it. Figure 9 Construction order [Ooms] Flexbase Flexbase is a cooperation between Dura Vermeer, Dutch Construction Company and Unidek, European biggest producer of EPS. The main difference between the Flexbase variant and IMF variant is, that there is not a shell around the EPS blocks but there are interior concrete beams and is composed of multiple layers of EPS blocks. The floating bodies are constructed on the water see Figure 10 Construction order. The first layer(s) of EPS blocks are connected with each other with scarf joints (haaklas). When the first layer is connected and finished EPS blocks will layered upon each other and glued together. Between the last few layers of EPS block there will be space left for the concrete beams. The next step if pouring the concrete in the open spaces. When the concrete is hardened the reinforcement can be placed and the concrete can be poured to create the floor. After hardening of the concrete the floating body is finished. This variant is used for the floating greenhouse in Naaldwijk and for the floating pavilion in Rotterdam, more information can be found in chapter 11.1 Floating Pavilion. Figure 10 Construction order [Flexbase] The biggest disadvantage is that the concrete beams are in situ poured in the gaps between the EPS blocks but before the pouring is done the structural rigidity is very low. This means that during pouring of the concrete the floating platform will deform a bit. The hardened concrete beams will have this deformation. (M. Koekoek). This disadvantage could be taken away if the structure is built on land instead of the water. A second disadvantage is that the EPS structure is not fully protected by concrete so there is a chance that the EPS can break or worse disconnects from the structure Flexbase light Flexbase light is a product from the same company as Flexbase. This product is especially made for floating sport fields. Flexbase light is designed to combine a water retention area with a sportfield. 5

12 Floating Structures The Flexbase Light foundation consist of EPS plates with on both sides a glass fibre reinforced cloth. Flexbase Light system is based to create a equilibrium situation on the ground level so that when there is enough water the sport field will float. The principle is depicted in Figure 11 Flexbase light system. The properties of a floating sport field according to Flexbase are: - Maximum irregularity is 7 mm; - Maximum deformation is 4-10 mm; - Shockdamping, %; - Lifespan > 5 years Steel tubes Steel tubes are not often used for floating bodies for housing but in the offshore world it is more often used. Steel needs maintenance, for floating bodies this is a big disadvantage. The dead weight of steel is very large but the strength is also large so floating bodies can be constructed with less material. Due to the low weight the centre of gravity will be higher, that is unfavourable for the stability of the structure. For offshore structures this problem is solved by bringing the floating body under water. For floating structures like housing this is impossible due to the maximum depth of inland waters. In Middelburg a floating house (Figure 1) is constructed with steel tubes the problem of static stability is solved by filling the tubes with concrete which results in a deeper draught. Figure 12 Floating house Middelburg [woonen] 6 Figure 11 Flexbase light system [Flexbase]

13 Floating Structures 1.3. Offshore Pneumatically stabilised platform (PSP) A pneumatically stabilised platform is a platform which is composed of multiple cylinders of concrete or steel see Figure 13. These cylinders remain together by a rectangular platform at the top of the cylinders. The cylinders can have all kinds of diameters for small structures a dimension of decimetres and for large structures the diameter is several meters. The buoyancy comes from the air pressure between the water surface and the top deck. Figure 14 Detail air exchange Figure 13 PSP platform The pneumatically stabilised platforms are very stable because the air in the cylinders is connected with each other so the air can flow from one cylinder to the other. In case of waves the water level changes as a result the air flows from one cylinder to another see Figure 14 because of this movement the platform stays stabile. PSP s may be deployed in regions with extreme wave heights. (Floatinc.) Semi-submersible structures Semi-submersible structures are often used in the offshore branch. Those platforms are very stable because the design is in such a way that waves forces are minimized. Figure 15 shows an example of a semi-submersible structure. Semi-submersible structures have a minimum amount of surface around the water surface. On the water surface the wave forces are the highest so with minimum surfaces on that place the dynamic stability is better. With this reason these semisubmersible structures perform well at heavy ocean conditions. The working platforms are raised above the sea level by column tubes or ballast structural elements. A disadvantage is that these platforms have a deep draught between 15 en 50 meters. Typical examples of semi-submersible structures are oil drilling and oil production platforms. 7

14 Floating Structures Figure 15 Semi-Submersible Tension leg A tension leg platform is vertically moored to the sea bottom with tension legs see Figure 16. Tension legs are a group of tethers or chains. These tension legs have a very low axial elasticity, so a high axial stiffness. Because the low elasticity the platform is not sensitive to vertical motions because the tension legs do not extend. These platforms are often used for oil production and drilling but there are plans to build wind turbines with tension legs. This has an advantage that wind turbine farms can be built further from the coast. Researchers of Massachusetts Institute of Technology and the National Renewable Energy Laboratory investigated this option and concluded that it would be cheaper than fixed towers. Figure 16 Tension leg Spar/Buoy A Spar is a long slender body that floats vertically see Figure 17, with its centre of gravity below its centre of buoyancy. All other floating platforms have their centres of gravity above their centres of buoyancy, and could flip over. Spars are inherently safe because they cannot flip over. In addition to inherent safety, a Spar is the most stable floating platform for supporting risers and guiding top tensioned risers. The deep draft of the Spar minimizes vertical motion and Spars inherently pitch (rotate) around their keel (bottom), close to where the risers exit. The keel then is the place of minimum vertical and lateral motion, ideal for supporting the risers (Technip).

15 Floating Structures Floating Road Hedel Several Dutch companies developed a prototype of a floating road and tested it, see Figure 19. The floating road was situated in Hedel in the province Noord-Brabant in the Netherlands. The design speed of this floating road was 80 km/h. The floating road is especially suitable for temporary use. The road consists of aluminium pontoons. One pontoon has a width of 5.4 meters a length of 3.5 meters and a height of 1.6 meters. The pontoons dead weight is 3100kg Bridges and roads Figure 17 Spar/Buoy Pontjesbrug Also some floating bridges and roads doe exist. Maybe the most famous one is the Pontjesbrug in Willemstad, Curacao see Figure 18. This bridge is constructed on multiple pontoons which are connected through the bridge deck. The bridge is 168 meters long and was built in The road is designed with a maximum load of only one vehicle at a time of 8000kg. The road is also suitable for pedestrians. The design load for pedestrians was 4kN/m 2. During the design the highest wind load is used to calculate the wind force. For wind waves, a typical wind wave of length of 6.3 meters, an height of 0.30 meters and a period of 2 seconds is used. (Maljaars) Figure 19 Floating road Hedel Figure 18 Pontjesbrug 9

16 Floating Structures 1.5. Studies Maarten Kuijper Variant Maarten Kuijper has made a design for a floating foundation during his graduation project. His final design is a frame system which is composed of EPS blocks; see Figure 20 One element has a dimension of 3 meters wide and 12 meters long. These elements can be coupled to each other. Every element has 16 EPS blocks with a wide and length of 1.5 meters. The EPS blocks have a special shape when combining the blocks some space will be left. In this space concrete will be poured and so concrete beams will be formed. In longitudinal direction there is one concrete beam and in transverse direction, depending on the design every 1.5 or 3 meter there is a concrete beam. On top a beam grid floor is built. The floating elements are coupled together with pretension cables. These cables are put in the concrete beams. The pretension can be done in one direction or two directions. For smaller platforms it is possible to connect the element with a bolted connection. More detailed information can be found in the thesis form Maarten Kuijper [M. Kuijper]. see Figure 21. The shape of one element is a hexagon. The EPS core consists of prefab EPS discs. When using different number of discs the height and buoyancy can be varied. The EPS core is also the formwork for the concrete frame. Concrete that is used is selfcompacting high strength concrete. Figure 21 Ties Rijcken system The elements can be connected on two different manners. The first manner is simply using internally threaded couplers, steel rings and bolts. The second manner is to pour multiple modules in one time. Figure 20 Maarten Kuijper system Ties Rijcken Ties Rijcken graduated at the faculty of Industrial design of the Technical University Delft. His graduation was projected a new concept for a floating foundation. Together with ABC Arkenbouw he realised his graduation thesis. The floating foundation of Ties Rijcken is built from elements that consist of a core of EPS around this core there is a concrete shell

17 Floating Structures Aqua-struenda This variant also uses EPS blocks in combination with concrete. The floating body has an EPS core with concrete walls as depicted in Figure 22. On top of the core a concrete floor with a beam grid is placed this grid has a height of 600 millimetres. On this beam grid a concrete deck floor is constructed. In the space between the beam grid and the deck floor there is space. One element is 15.8 meters wide 108 meters long and has a thickness of 3.5 meters. The measurements are derived from a planning grid of 3.6 meters which is quite a standardized dimension for housing. (ecoboot) Figure 22 Aqua-struenda system 11

18 Stadiums 2. STADIUMS 2.1. Demountable Stadiums Demountable stadiums are built all around the world and there a many different types of stadiums like multifunctional stadiums, stadiums just for one sport and temporary stadiums. In this study only temporary or demountable stadiums are of interest. In this chapter an overview is given about different demountable stadiums techniques. Temporary stadium and grandstands which are constructed with a scaffolding structure is a proven technique. There are a lot of references for scaffolding stadiums. Scaffolding structures are demountable and portable. Scaffolding is often used as temporary structure and can be rented at many places. The system consists of steel or aluminium pipes which can be easily connected to each other. The erection time is very short. An example of a grandstand with a scaffolding structure is depicted in Figure 23. With these systems even a roof structure is possible to construct. The foundations for such stadiums are wooden plates, 400*400mm. [Den Hollander] also possible to construct a second tier with a modular system. Figure 24 depict a modular steel structure. The highest built structures are around 30 meters. [den Hollander] Figure 24 Modular steel grandstand [Nussli] The properties of the different techniques are shown in Figure Figure 23 Scaffolding grandstand [Nussli] Modular steel structures are also often applied for stadiums. These structures are a bit less flexible and transportable but it is possible. The modules are a bit bigger but remain flexible and adaptable. It is

19 Stadiums World of Football This stadium, Figure 26 was used during the world championship in 2006 in Germany. It is a replica of Berlin s Olympic stadium on a scale 1:3. This stadium was set up in front of the Reichstag. It provides a place for football fans to watch the games on big screens. The capacity of the stadium is people The stadium had eight skyboxes, a TV studio, a camera tower, disabled platforms and a CD tower with a 20*18 meters footprint for concerts and shows. The total surface area was m 2. Altogether tons of material, supplied in 65 truck loads, was erected for this event. [Nussli.com] Figure 26 World of Football stadium Figure 25 Comparison Scaffolding with Modular structures Nussli Nussli is a leading company on temporary structures and it operates all over the world. Their core businesses are grandstands, modular stadiums, booth constructions and pavilion constructions along with the overall delivery of event structures and exhibition structures. [nussli.com] Nussli offers complete modular and temporary stadiums or grandstands. They have a lot of experience with construction temporary stadiums. They use mainly scaffolding to construct the stadiums and grandstand. They can even build temporary roofing. Nussli designed a lot of temporary stadiums two examples from Nussli will be described. 13

20 Stadiums Fortuna Dusseldorf In 2011 the Eurovision Song contest was hosted in the stadium of Fortuna Dusseldorf. During the Eurovision Song contest the home games of Fortune Dusseldorf were played in a temporary stadium which was built directly near their normal stadium see Figure 27. The stadium's total approximate spectator capacity of 20,000 is divided into seating for about 12,500 fans and standing room for an additional 7,500. The functional rooms for the teams will be set up in fully equipped containers located behind the main grandstand. The stadium was built in just 8 weeks and was leased during the period. The stadium was built in accordance with the German soccer association and the German soccer league guidelines. Baseball Figure 28 San Diego floating stadium Football 14 Figure 27 Fortuna Dussseldorf 2.2. Floating stadiums San Diego In 1964 a local firm Boyle Engineering in San Diego proposed a floating stadium that should float in the Mission Bay. The stadium should hosting football, major league baseball and aquatic event and the stadium would seat over fans on a site near Fiesta Island. The stadium would consist of three huge sections according to the Boyle Company. A grandstand, seating about would be landlocked and is the centre section. Two wings of seats each would float on pontoons and could be easily maneuverer into various configurations to support the spectator requirements of different sports see Figure 28 For baseball, the two wings would be attached to the centre grandstand. For football, the wings would be disengaged and floated over to cover both sides of a separate playing field. With other configurations fans could watch water sports on the bay. Requiring only eleven feet (3.35 meters) of draft, the sections would move easily. The price tag was estimated on a $20 million that is about the same costs as a conventional stadium in Unfortunately the stadium has never been built; instead a conventional multipurpose facility was approved and finished in [Crawford]

21 Stadiums Michael Burt Michael Burt is an Israeli emeritus professor at the ITT, he suggest that mega-events should be organized on floating structures. When the event is closed the floating structures can move on to the next city with a harbour and be a platform for the next football match or concert. For the Olympic Games he suggested a stadium with seats with measurements of 300*400 meters. This stadium is the centre point when a city doesn t has enough facilities extra floating structures housing for the athletes can be attached. He got the idea for the floating stadium 20 years ago but did not develop it further before colleagues Yechiel Rosenfeld and Anna Sorkin offered to help him fine-tune and promote the plan which has only become more timely and feasible as research into space technology has led to the discovery of new and lighter materials. The trio has looked at a world map and estimates that five floating stadiums can cover the Baltic Sea, the Mediterranean, the Caribbean, the Indian Ocean and Asia. [play the game] sustainable practices. The stadium houses 180 VIP boxes and areas, office space for FIFA and local organizing committee members, as well as an opulent range of hospitality features, a hotel, a casino, a shopping centre, restaurants and a fitness centre. [sportsmagazine] Figure 30 Qatar 2022 stadium by stadiumconcept.de Bigfoot Heneghan Peng architects made a design for an ideas competition in 1997 for a football stadium at Santa Monica State beach in order to entice football teams back to LA which had been deserted by two football teams in previous years. The name of the stadium is Bigfoot. The form of the ship/stadium is derived from a super tanker into which a football stadium for 80,000 has been inserted see Figure 31. The form of the ship s hull is modified slightly to accommodate the idealized stadium. Under-stadium activities of concession stands, access ways and services occupy the interstitial space between the stadium and the hull. [hparc.com] Figure 29 Michael Burt design Qatar 2022 In 2022 the FIFA world cup will be in Qatar. Stadiumconcept.de and ArenaCom made a proposal for a floating offshore stadium for visitors. The size of this stadium is almost a big as the RMS Queen Mary 2, Figure 30. The stadium would be founded on a large floating disk and constructed using renewable materials and Figure 31 Bigfoot floating stadium 15

22 Stadiums 2.3. Studies There are some master theses made about floating stadiums these theses are made within the faculty of architecture at Delft University of Architecture Innovative Stadium Design Building up the stadium out of several modules, able to function on its own and as several configurations is the solution for a flexible stadium. Besides the flexibility, the functionality of the design is normative to create a realistic stadium design. The several modules, a configuration with two tiers and a configuration with three tiers are developed for the Innovative Stadium Design. To transport the stadium over water, the stadium will be built on pontoons. For optimal transport, the main requirement was to be able to cross the Panama Canal. This determines the maximum dimensions for the pontoons and guarantees the optimal usage and transportability. All the separate pontoons will have to be stable and will be coupled to one rigid stadium pontoon. For optimal pontoon usage, the stadium has been separated in four elements; the pitch, first and second configuration and the entrance. By using the same entrance pontoons in both configurations, an optimization was made. To get a realistic and feasible stadium design, the scale of disassembly and the building time are the most important aspects of assembly and disassembly. The stadium design consists of several modules, in which platform design is the starting point. Platform design results in standardization of the modules which limited the number of loose elements and thus the building time. The standardization is visible in the modules which results in the stadium, but also in the added functions like toilets and SUP's. These functions will be added as universal units. [Fransen, Vermeulen] Figure 32 Innovative Stadium Design study Olympic fleet The Rotterdam Olympic stadium is built up out of floating elements and temporary components. A traditional stadium bowl is cut into separate parts to increase the post-olympic legacy potential. The floating stadium elements can be reused as housing elements elsewhere in the Netherlands and abroad, but can also be used for other purposes such as flood shelters. The temporary parts can be reused as stands for different sport clubs and temporary events. The Rotterdam harbour area is moving towards the sea. The Rotterdam Stadshavens are developed into the pilot project for floating buildings. A number of stadium elements are reused into a floating residential community in the Waalhaven area see Figure 33. The elements are reminders of the Olympic Games of 2028 and form the infrastructure and architectural expression for the transformation of this area. [Goeman] Figure 33 Olympic fleet

Quality requirements concerning the packaging of oak lumber of Houthandel Wijers vof (09.09.14)

Quality requirements concerning the packaging of oak lumber of Houthandel Wijers vof (09.09.14) Quality requirements concerning the packaging of oak lumber of (09.09.14) Content: 1. Requirements on sticks 2. Requirements on placing sticks 3. Requirements on construction pallets 4. Stick length and

Nadere informatie

Opgave 2 Geef een korte uitleg van elk van de volgende concepten: De Yield-to-Maturity of a coupon bond.

Opgave 2 Geef een korte uitleg van elk van de volgende concepten: De Yield-to-Maturity of a coupon bond. Opgaven in Nederlands. Alle opgaven hebben gelijk gewicht. Opgave 1 Gegeven is een kasstroom x = (x 0, x 1,, x n ). Veronderstel dat de contante waarde van deze kasstroom gegeven wordt door P. De bijbehorende

Nadere informatie

PROJECT INFORMATION Building De Meerlanden Nieuweweg 65 in Hoofddorp

PROJECT INFORMATION Building De Meerlanden Nieuweweg 65 in Hoofddorp BT Makelaars Aalsmeerderweg 606 Rozenburg Schiphol Postbus 3109 2130 KC Hoofddorp Telefoon 020-3 166 166 Fax 020-3 166 160 Email: info@btmakelaars.nl Website : www.btmakelaars.nl PROJECT INFORMATION Building

Nadere informatie

CHROMA STANDAARDREEKS

CHROMA STANDAARDREEKS CHROMA STANDAARDREEKS Chroma-onderzoeken Een chroma geeft een beeld over de kwaliteit van bijvoorbeeld een bodem of compost. Een chroma bestaat uit 4 zones. Uit elke zone is een bepaald kwaliteitsaspect

Nadere informatie

S e v e n P h o t o s f o r O A S E. K r i j n d e K o n i n g

S e v e n P h o t o s f o r O A S E. K r i j n d e K o n i n g S e v e n P h o t o s f o r O A S E K r i j n d e K o n i n g Even with the most fundamental of truths, we can have big questions. And especially truths that at first sight are concrete, tangible and proven

Nadere informatie

Extreem veilig Het product Our product Voordeel Advantage Bajolock Bajolock Bajolock Bajolock Bajolock Bajolock Bajolock

Extreem veilig Het product Our product Voordeel Advantage Bajolock Bajolock Bajolock Bajolock Bajolock Bajolock Bajolock Extreem veilig Het product Alle koppeling zijn speciaal ontworpen en vervaardigd uit hoogwaardig RVS 316L en uitgevoerd met hoogwaardige pakkingen. Op alle koppelingen zorgt het gepatenteerde veiligheid

Nadere informatie

I.S.T.C. Intelligent Saving Temperature Controler

I.S.T.C. Intelligent Saving Temperature Controler MATEN & INFORMATIE I.S.T.C. Intelligent Saving Temperature Controler Deze unieke modulerende zender, als enige ter wereld, verlaagt het energieverbruik aanzienlijk. Het werkt in combinatie met de energy

Nadere informatie

Invloed van het aantal kinderen op de seksdrive en relatievoorkeur

Invloed van het aantal kinderen op de seksdrive en relatievoorkeur Invloed van het aantal kinderen op de seksdrive en relatievoorkeur M. Zander MSc. Eerste begeleider: Tweede begeleider: dr. W. Waterink drs. J. Eshuis Oktober 2014 Faculteit Psychologie en Onderwijswetenschappen

Nadere informatie

Aim of this presentation. Give inside information about our commercial comparison website and our role in the Dutch and Spanish energy market

Aim of this presentation. Give inside information about our commercial comparison website and our role in the Dutch and Spanish energy market Aim of this presentation Give inside information about our commercial comparison website and our role in the Dutch and Spanish energy market Energieleveranciers.nl (Energysuppliers.nl) Founded in 2004

Nadere informatie

Appendix A: List of variables with corresponding questionnaire items (in English) used in chapter 2

Appendix A: List of variables with corresponding questionnaire items (in English) used in chapter 2 167 Appendix A: List of variables with corresponding questionnaire items (in English) used in chapter 2 Task clarity 1. I understand exactly what the task is 2. I understand exactly what is required of

Nadere informatie

Ontpopping. ORGACOM Thuis in het Museum

Ontpopping. ORGACOM Thuis in het Museum Ontpopping Veel deelnemende bezoekers zijn dit jaar nog maar één keer in het Van Abbemuseum geweest. De vragenlijst van deze mensen hangt Orgacom in een honingraatpatroon. Bezoekers die vaker komen worden

Nadere informatie

SPX Model A-360 Azimuth Antenna Rotor Model 1 & 2

SPX Model A-360 Azimuth Antenna Rotor Model 1 & 2 Gauke Boelensstraat 108 NL-9203 RS Drachten The Netherlands Tel: +31 (0) 512 354 126 GSM: +31 (0) 650 882 889 Fax: +31 (0) 847 187 776 www.rfhamdesign.com E-mail: info@rfhamdesign.com Model A-360 Azimuth

Nadere informatie

The Dutch mortgage market at a cross road? The problematic relationship between supply of and demand for residential mortgages

The Dutch mortgage market at a cross road? The problematic relationship between supply of and demand for residential mortgages The Dutch mortgage market at a cross road? The problematic relationship between supply of and demand for residential mortgages 22/03/2013 Housing market in crisis House prices down Number of transactions

Nadere informatie

ETS 4.1 Beveiliging & ETS app concept

ETS 4.1 Beveiliging & ETS app concept ETS 4.1 Beveiliging & ETS app concept 7 juni 2012 KNX Professionals bijeenkomst Nieuwegein Annemieke van Dorland KNX trainingscentrum ABB Ede (in collaboration with KNX Association) 12/06/12 Folie 1 ETS

Nadere informatie

Socio-economic situation of long-term flexworkers

Socio-economic situation of long-term flexworkers Socio-economic situation of long-term flexworkers CBS Microdatagebruikersmiddag The Hague, 16 May 2013 Siemen van der Werff www.seo.nl - secretariaat@seo.nl - +31 20 525 1630 Discussion topics and conclusions

Nadere informatie

Researchcentrum voor Onderwijs en Arbeidsmarkt The role of mobility in higher education for future employability

Researchcentrum voor Onderwijs en Arbeidsmarkt The role of mobility in higher education for future employability The role of mobility in higher education for future employability Jim Allen Overview Results of REFLEX/HEGESCO surveys, supplemented by Dutch HBO-Monitor Study migration Mobility during and after HE Effects

Nadere informatie

STEP BY STEP / STAPPENPLAN KORTE SMEESTRAAT 12

STEP BY STEP / STAPPENPLAN KORTE SMEESTRAAT 12 STEP BY STEP / STAPPENPLAN KORTE SMEESTRAAT 12 The right wall consists of a original bearing wall and a whole brick thickness outer layer. Historical photos can be found in appendix 1. Later a new building

Nadere informatie

Interaction Design for the Semantic Web

Interaction Design for the Semantic Web Interaction Design for the Semantic Web Lynda Hardman http://www.cwi.nl/~lynda/courses/usi08/ CWI, Semantic Media Interfaces Presentation of Google results: text 2 1 Presentation of Google results: image

Nadere informatie

7 Piece Fillet Weld Set

7 Piece Fillet Weld Set 7 Piece Fillet Weld Set Checking Fillet Throat Size Checking Fillet Leg Size Bridge Cam Gauge The following measurements are possible either in inches or millimeters Angle of preparation, 0º to 60º Excess

Nadere informatie

04/11/2013. Sluitersnelheid: 1/50 sec = 0.02 sec. Frameduur= 2 x sluitersnelheid= 2/50 = 1/25 = 0.04 sec. Framerate= 1/0.

04/11/2013. Sluitersnelheid: 1/50 sec = 0.02 sec. Frameduur= 2 x sluitersnelheid= 2/50 = 1/25 = 0.04 sec. Framerate= 1/0. Onderwerpen: Scherpstelling - Focusering Sluitersnelheid en framerate Sluitersnelheid en belichting Driedimensionale Arthrokinematische Mobilisatie Cursus Klinische Video/Foto-Analyse Avond 3: Scherpte

Nadere informatie

De Samenhang tussen Dagelijkse Stress en Depressieve Symptomen en de Mediërende Invloed van Controle en Zelfwaardering

De Samenhang tussen Dagelijkse Stress en Depressieve Symptomen en de Mediërende Invloed van Controle en Zelfwaardering De Samenhang tussen Dagelijkse Stress en Depressieve Symptomen en de Mediërende Invloed van Controle en Zelfwaardering The Relationship between Daily Hassles and Depressive Symptoms and the Mediating Influence

Nadere informatie

right place, right time

right place, right time right place, right time PND: constructie èn industriële verhuizingen Combinatie van twee disciplines maakt PND tot de ideale partner Het verhaal achter de succesformule van PND is eenvoudig. Van oorsprong

Nadere informatie

SPX AX-400 Azimuth & Elevation antenna rotator Model 1 & 2

SPX AX-400 Azimuth & Elevation antenna rotator Model 1 & 2 Gauke Boelensstraat 108 NL-9203 RS Drachten The Netherlands Tel: +31 (0) 512 354 126 GSM: +31 (0) 650 882 889 Fax: +31 (0) 847 187 776 www.rfhamdesign.com E-mail: info@rfhamdesign.com SPX AX-400 Azimuth

Nadere informatie

Het beheren van mijn Tungsten Network Portal account NL 1 Manage my Tungsten Network Portal account EN 14

Het beheren van mijn Tungsten Network Portal account NL 1 Manage my Tungsten Network Portal account EN 14 QUICK GUIDE C Het beheren van mijn Tungsten Network Portal account NL 1 Manage my Tungsten Network Portal account EN 14 Version 0.9 (June 2014) Per May 2014 OB10 has changed its name to Tungsten Network

Nadere informatie

Functioneel Ontwerp / Wireframes:

Functioneel Ontwerp / Wireframes: Functioneel Ontwerp / Wireframes: Het functioneel ontwerp van de ilands applicatie voor op de iphone is gebaseerd op het iphone Human Interface Guidelines handboek geschreven door Apple Inc 2007. Rounded-Rectangle

Nadere informatie

Risico s van CO2 leidingen

Risico s van CO2 leidingen takes gastransport further Risico s van CO2 leidingen Kennistafel buisleidingen T. Veenstra HSE coordinator Utrecht, 7 september 2010 Groningen, 9-9-2010 1 Inhoud Duurzaamheidsbeleid van Gasunie Ontwikkelingen

Nadere informatie

Stephanie van Dijck De integrale aanpak maakt complexiteit hanteerbaar

Stephanie van Dijck De integrale aanpak maakt complexiteit hanteerbaar Titel, samenvatting en biografie Stephanie van Dijck De integrale aanpak maakt complexiteit hanteerbaar Samenvatting: Nieuwe projecten nemen toe in complexiteit: afhankelijkheden tussen software componenten,

Nadere informatie

Johto. Flexible light

Johto. Flexible light Johto Flexible light Johto is a high quality lighting system based on LED for technically sophisticated interior and exterior light. It provides homogeneous and dot free illumination in very low installation

Nadere informatie

From Padua to Groningen

From Padua to Groningen From Padua to Groningen The effects of the CercleS Seminar in Padua in 2009 on writing Nederlands in gang (0-A2) Berna de Boer Benvenuti a tutti! Contents I. State of affairs in September 2009 II. The

Nadere informatie

Digital municipal services for entrepreneurs

Digital municipal services for entrepreneurs Digital municipal services for entrepreneurs Smart Cities Meeting Amsterdam October 20th 2009 Business Contact Centres Project frame Mystery Shopper Research 2006: Assessment services and information for

Nadere informatie

1a. We werken het geval voor het tandenpoetsen uit. De concepten zijn (we gebruiken Engelse termen en afkortingen):

1a. We werken het geval voor het tandenpoetsen uit. De concepten zijn (we gebruiken Engelse termen en afkortingen): Uitwerking Huiswerkopgave Inleiding Modelleren Hoofdstuk 3 1a. We werken het geval voor het tandenpoetsen uit. De concepten zijn (we gebruiken Engelse termen en afkortingen): tube=[cap:{open,close},hand:{l,r,none}]

Nadere informatie

Innovative SUMP-Process in Northeast-Brabant

Innovative SUMP-Process in Northeast-Brabant Innovative SUMP-Process in Northeast-Brabant #polis14 Northeast-Brabant: a region in the Province of Noord-Brabant Innovative Poly SUMP 20 Municipalities Province Rijkswaterstaat Several companies Schools

Nadere informatie

Ius Commune Training Programme 2015-2016 Amsterdam Masterclass 16 June 2016

Ius Commune Training Programme 2015-2016 Amsterdam Masterclass 16 June 2016 www.iuscommune.eu Dear Ius Commune PhD researchers, You are kindly invited to attend the Ius Commune Amsterdam Masterclass for PhD researchers, which will take place on Thursday 16 June 2016. During this

Nadere informatie

De bijsluiter in beeld

De bijsluiter in beeld De bijsluiter in beeld Een onderzoek naar de inhoud van een visuele bijsluiter voor zelfzorggeneesmiddelen Oktober 2011 Mariëtte van der Velde De bijsluiter in beeld Een onderzoek naar de inhoud van een

Nadere informatie

MILANO HANDLEIDING INSTRUCTIONS

MILANO HANDLEIDING INSTRUCTIONS MILANO HANDLEIDING INSTRUCTIONS Gefeliciteerd met de aanschaf van uw nieuwe Markant Milano bureaustoel! Markant stoelen zijn het resultaat van constante vernieuwingen op ergonomisch gebied. Hierdoor is

Nadere informatie

Firewall van de Speedtouch 789wl volledig uitschakelen?

Firewall van de Speedtouch 789wl volledig uitschakelen? Firewall van de Speedtouch 789wl volledig uitschakelen? De firewall van de Speedtouch 789 (wl) kan niet volledig uitgeschakeld worden via de Web interface: De firewall blijft namelijk op stateful staan

Nadere informatie

Working with Authorities

Working with Authorities Working with Authorities Finding the balance in the force field of MUSTs, SHOULDs, CANs, SHOULD-NEVERs, CANNOTs Jacques Schuurman SURFnet-CERT Amsterdam, 24 February 2006 Hoogwaardig internet voor hoger

Nadere informatie

SPID Azimuth antenna rotator Type: RAK

SPID Azimuth antenna rotator Type: RAK Gauke Boelensstraat 108 NL-9203 RS Drachten The Netherlands Tel: +31 (0) 512 354 126 GSM: +31 (0) 650 882 889 Fax: +31 (0) 847 187 776 www.rfhamdesign.com E-mail: info@rfhamdesign.com SPID Azimuth antenna

Nadere informatie

Understanding and being understood begins with speaking Dutch

Understanding and being understood begins with speaking Dutch Understanding and being understood begins with speaking Dutch Begrijpen en begrepen worden begint met het spreken van de Nederlandse taal The Dutch language links us all Wat leest u in deze folder? 1.

Nadere informatie

Verschillen in het Gebruik van Geheugenstrategieën en Leerstijlen. Differences in the Use of Memory Strategies and Learning Styles

Verschillen in het Gebruik van Geheugenstrategieën en Leerstijlen. Differences in the Use of Memory Strategies and Learning Styles Verschillen in het Gebruik van Geheugenstrategieën en Leerstijlen tussen Leeftijdsgroepen Differences in the Use of Memory Strategies and Learning Styles between Age Groups Rik Hazeu Eerste begeleider:

Nadere informatie

Wilvo heeft zich sinds de oprichting in 1970 continu ontwikkeld. Het resultaat is haar huidige vooraanstaande rol binnen de toeleveringswereld.

Wilvo heeft zich sinds de oprichting in 1970 continu ontwikkeld. Het resultaat is haar huidige vooraanstaande rol binnen de toeleveringswereld. S H E E T M E T A L p a r t s a n d a s s e m b l i e s I n t r o d u c t i e Wilvo heeft zich sinds de oprichting in 1970 continu ontwikkeld. Het resultaat is haar huidige vooraanstaande rol binnen de

Nadere informatie

Tentamen Thermodynamica

Tentamen Thermodynamica Tentamen Thermodynamica 4B420 4B421 10 november 2008, 14.00 17.00 uur Dit tentamen bestaat uit 4 opeenvolgend genummerde opgaven. Indien er voor de beantwoording van een bepaalde opgave een tabel nodig

Nadere informatie

SPID Azimuth antenna rotator Type: BIG-RAK

SPID Azimuth antenna rotator Type: BIG-RAK SPID Azimuth antenna rotator Type: BIG-RAK Specifications: SPID BIG RAK PWM Azimuth Rotator BIG RAK @ 12V BIG RAK @ 18V Turning torque in-lbs/nm 2,800 in lb/315 Nm 3,600 in lb/403 Nm Brake Torque in lbs/nm

Nadere informatie

Lichamelijke factoren als voorspeller voor psychisch. en lichamelijk herstel bij anorexia nervosa. Physical factors as predictors of psychological and

Lichamelijke factoren als voorspeller voor psychisch. en lichamelijk herstel bij anorexia nervosa. Physical factors as predictors of psychological and Lichamelijke factoren als voorspeller voor psychisch en lichamelijk herstel bij anorexia nervosa Physical factors as predictors of psychological and physical recovery of anorexia nervosa Liesbeth Libbers

Nadere informatie

Handleiding Installatie ADS

Handleiding Installatie ADS Handleiding Installatie ADS Versie: 1.0 Versiedatum: 19-03-2014 Inleiding Deze handleiding helpt u met de installatie van Advantage Database Server. Zorg ervoor dat u bij de aanvang van de installatie

Nadere informatie

Leading in Learning -> studiesucces. Ellen Bastiaens Programmamanager Leading in Learning 13 juni 2012

Leading in Learning -> studiesucces. Ellen Bastiaens Programmamanager Leading in Learning 13 juni 2012 Leading in Learning -> studiesucces Ellen Bastiaens Programmamanager Leading in Learning 13 juni 2012 Implementatie van matchingsinstrument Matching na de poort wordt aan de poort Vooropleiding Bachelor

Nadere informatie

RAI Elicium. A brighter place

RAI Elicium. A brighter place Amsterdam RAI bouwt aan de toekomst Amsterdam RAI is uitgebreid met een geheel nieuw gebouw: Met het innovatieve Elicium is de RAI nog beter in staat om klanten te bedienen met hoogwaardige faciliteiten.

Nadere informatie

Guidelines for setting up a stimul lab

Guidelines for setting up a stimul lab Guidelines for setting up a stimul lab Content Chapter 1 Chapter 2 Chapter 3 Chapter 4 Chapter 5 Chapter 6 Chapter 7 Pilotproject Businessplan Samenwerkingsovereenkomst met stimul Moorsele Building requirements

Nadere informatie

LDA Topic Modeling. Informa5ekunde als hulpwetenschap. 9 maart 2015

LDA Topic Modeling. Informa5ekunde als hulpwetenschap. 9 maart 2015 LDA Topic Modeling Informa5ekunde als hulpwetenschap 9 maart 2015 LDA Voor de pauze: Wat is LDA? Wat kan je er mee? Hoe werkt het (Gibbs sampling)? Na de pauze Achterliggende concepten à Dirichlet distribu5e

Nadere informatie

liniled Cast Joint liniled Gietmof liniled Castjoint

liniled Cast Joint liniled Gietmof liniled Castjoint liniled Cast Joint liniled Gietmof liniled is een hoogwaardige, flexibele LED strip. Deze flexibiliteit zorgt voor een zeer brede toepasbaarheid. liniled kan zowel binnen als buiten in functionele en decoratieve

Nadere informatie

Quick scan method to evaluate your applied (educational) game. Validated scales from comprehensive GEM (Game based learning Evaluation Model)

Quick scan method to evaluate your applied (educational) game. Validated scales from comprehensive GEM (Game based learning Evaluation Model) WHAT IS LITTLE GEM? Quick scan method to evaluate your applied (educational) game (light validation) 1. Standardized questionnaires Validated scales from comprehensive GEM (Game based learning Evaluation

Nadere informatie

Welkom in het nieuwe academische jaar! We hopen dat iedereen een goede zomerperiode heeft gehad.

Welkom in het nieuwe academische jaar! We hopen dat iedereen een goede zomerperiode heeft gehad. DATUM: 22-09-2009 (You will find the English version below) Beste allen, Welkom in het nieuwe academische jaar! We hopen dat iedereen een goede zomerperiode heeft gehad. NIEUWSBRIEF No. 1 Dit is de eerste

Nadere informatie

Schiphol Airport Logistics Centre. 25,000 sqm built-to-suit development opportunity in Schiphol Airport. Is your logistics. ready for take-off?

Schiphol Airport Logistics Centre. 25,000 sqm built-to-suit development opportunity in Schiphol Airport. Is your logistics. ready for take-off? Schiphol Airport Logistics Centre 25,000 sqm built-to-suit development opportunity in Schiphol Airport Is your logistics ready for take-off? Schiphol Airport Logistics Centre Naritaweg, 1436 Aalsmeerderbrug,

Nadere informatie

ESOMAR PAPER: Four simple strategies: 25% more ROI for newspaper advertisement

ESOMAR PAPER: Four simple strategies: 25% more ROI for newspaper advertisement ESOMAR PAPER: Four simple strategies: 25% more ROI for newspaper advertisement Learnings from 2011 case for: Erdee Media Group Cebuco, Amsterdam BY Martin Leeflang (Validators) Esomar Paper Augustus 2011

Nadere informatie

Workflow en screenshots Status4Sure

Workflow en screenshots Status4Sure Workflow en screenshots Status4Sure Inleiding Het Status4Sure systeem is een ICT oplossing waarmee de transportopdrachten papierloos door het gehele proces gaan. De status kan gevolgd worden door de logistieke

Nadere informatie

Lelystad, Mainport Park A6

Lelystad, Mainport Park A6 Lelystad, Mainport Park A6 kavels vanaf 0,5 tot 21 hectare building plots as of 5,000 up 21 hectares 100% bebouwbaar site coverage 100% direct aan luchthaven directly linked to airport centraal in Nederland

Nadere informatie

Ir. Herman Dijk Ministry of Transport, Public Works and Water Management

Ir. Herman Dijk Ministry of Transport, Public Works and Water Management Policy Aspects of Storm Surge Warning Systems Ir. Herman Dijk Ministry of Transport, Public Works and Water Contents Water in the Netherlands What kind of information and models do we need? Flood System

Nadere informatie

Graphic Design. Keuzevak GD1. Raul Martinez-Orozco (r.d.martinez.orozco@hro.nl / raul@thecombine.nl)

Graphic Design. Keuzevak GD1. Raul Martinez-Orozco (r.d.martinez.orozco@hro.nl / raul@thecombine.nl) Graphic Design 1 Graphic Design Keuzevak GD1 Raul Martinez-Orozco (r.d.martinez.orozco@hro.nl / raul@thecombine.nl) Graphic Design 2 Expectations Attendance, creativity, motivation and a professional attitude

Nadere informatie

SMART(ER) GATES Multi use and multi functional HUB s. ADVIER Mobiliseert, NIO Architecten en OKRA landschapsarchitecten

SMART(ER) GATES Multi use and multi functional HUB s. ADVIER Mobiliseert, NIO Architecten en OKRA landschapsarchitecten SMART(ER) GATES Multi use and multi functional HUB s ADVIER Mobiliseert, NIO Architecten en OKRA landschapsarchitecten Background and team Contest City of Antwerp design contest for parking houses (P+R

Nadere informatie

Systeem Wand Samenstellings Applicatie. Cabinet configuration tool. Nederlandse handleiding

Systeem Wand Samenstellings Applicatie. Cabinet configuration tool. Nederlandse handleiding Systeem Wand Samenstellings Applicatie Cabinet configuration tool Nederlandse handleiding 1 Handleiding bylsma wand configuratie tool... 2 1.1 Disclaimer... 2 2 Wand samenstellen... 2 2.1 Applicatie lay-out...

Nadere informatie

ATOS Viewer for Dental Frameworks User Manual

ATOS Viewer for Dental Frameworks User Manual ATOS Viewer for Dental Frameworks User Manual www.dentwise.eu Inhoud Content NEDERLANDS... 2 1. Installatie... 2 2. Algemene Functies... 2 3. Afstanden Meten... 3 4. Doorsneden Maken... 4 5. Weergave Aanpassen...

Nadere informatie

LED LIGHTING FOR COLD STORAGE

LED LIGHTING FOR COLD STORAGE LED LIGHTING FOR COLD STORAGE Madrid, October 16 Maarten de Graaf Didyouknowthat? It takes 0.65KWh of air conditioning energy to cool down every 1 kwh of lighting heat. Didyouknowthat? Meaning that youernergybillforlightingis

Nadere informatie

Uitwegen voor de moeilijke situatie van NL (industriële) WKK

Uitwegen voor de moeilijke situatie van NL (industriële) WKK Uitwegen voor de moeilijke situatie van NL (industriële) WKK Kees den Blanken Cogen Nederland Driebergen, Dinsdag 3 juni 2014 Kees.denblanken@cogen.nl Renewables genereren alle stroom (in Nederland in

Nadere informatie

Pesten onder Leerlingen met Autisme Spectrum Stoornissen op de Middelbare School: de Participantrollen en het Verband met de Theory of Mind.

Pesten onder Leerlingen met Autisme Spectrum Stoornissen op de Middelbare School: de Participantrollen en het Verband met de Theory of Mind. Pesten onder Leerlingen met Autisme Spectrum Stoornissen op de Middelbare School: de Participantrollen en het Verband met de Theory of Mind. Bullying among Students with Autism Spectrum Disorders in Secondary

Nadere informatie

De Relatie tussen Werkdruk, Pesten op het Werk, Gezondheidsklachten en Verzuim

De Relatie tussen Werkdruk, Pesten op het Werk, Gezondheidsklachten en Verzuim De Relatie tussen Werkdruk, Pesten op het Werk, Gezondheidsklachten en Verzuim The Relationship between Work Pressure, Mobbing at Work, Health Complaints and Absenteeism Agnes van der Schuur Eerste begeleider:

Nadere informatie

THERMOPLASTISCHE LAGERBLOKKEN THERMOPLASTIC BEARING UNITS

THERMOPLASTISCHE LAGERBLOKKEN THERMOPLASTIC BEARING UNITS THERMOPLASTISCHE LAGERBLOKKEN THERMOPLASTIC BEARING UNITS WBT THERMOPLASTISCHE LAGERBLOKKEN WBT lager blokken zijn gemaakt van PBT high-grade, glass-filled thermoplastisch polyester en zij zijn compleet

Nadere informatie

User Centred Development. UCD Werkcollege blok 1 week 4

User Centred Development. UCD Werkcollege blok 1 week 4 User Centred Development UCD Werkcollege blok 1 week 4 Agenda Introductie Huisregels Blok beschrijving Observatie opdracht & huiswerk Introductie Aranea Felëus Industrieel Ontwerpen Strategic Product Design

Nadere informatie

How to install and use dictionaries on the ICARUS Illumina HD (E652BK)

How to install and use dictionaries on the ICARUS Illumina HD (E652BK) (for Dutch go to page 4) How to install and use dictionaries on the ICARUS Illumina HD (E652BK) The Illumina HD offers dictionary support for StarDict dictionaries.this is a (free) open source dictionary

Nadere informatie

SHP-TS TwinArc SA SHP-TS 400W TWINARC E40 SL PRODUCT OVERVIEW

SHP-TS TwinArc SA SHP-TS 400W TWINARC E40 SL PRODUCT OVERVIEW Range Features Range of high pressure sodium lamps with double arc tube construction Dual arc tube design guarantees immediate re-strike after a power interruption Doubled lamp life and reduced occurrence

Nadere informatie

Taco Schallenberg Acorel

Taco Schallenberg Acorel Taco Schallenberg Acorel Inhoudsopgave Introductie Kies een Platform Get to Know the Jargon Strategie Bedrijfsproces Concurrenten User Experience Marketing Over Acorel Introductie THE JARGON THE JARGON

Nadere informatie

CREATING VALUE THROUGH AN INNOVATIVE HRM DESIGN CONFERENCE 20 NOVEMBER 2012 DE ORGANISATIE VAN DE HRM AFDELING IN WOELIGE TIJDEN

CREATING VALUE THROUGH AN INNOVATIVE HRM DESIGN CONFERENCE 20 NOVEMBER 2012 DE ORGANISATIE VAN DE HRM AFDELING IN WOELIGE TIJDEN CREATING VALUE THROUGH AN INNOVATIVE HRM DESIGN CONFERENCE 20 NOVEMBER 2012 DE ORGANISATIE VAN DE HRM AFDELING IN WOELIGE TIJDEN Mieke Audenaert 2010-2011 1 HISTORY The HRM department or manager was born

Nadere informatie

underground container systems metro, chiplock and winconsyst

underground container systems metro, chiplock and winconsyst underground container systems metro, chiplock and winconsyst vconsyst VConsyst specialises in manufacturing and exporting underground waste collection systems. With twenty years of experience and an installed

Nadere informatie

Smeertechniek Rotterdam Cairostraat 74 3047 BC Rotterdam Tel.: 010 466 62 55 Fax 010 466 66 55 Internet: www.smeertechniek.

Smeertechniek Rotterdam Cairostraat 74 3047 BC Rotterdam Tel.: 010 466 62 55 Fax 010 466 66 55 Internet: www.smeertechniek. DEZE KOPPELINGEN WORDEN GEBRUIKT IN OLIE- EN VETSMEERSYSTEMEN IN PLAATS VAN DE SNIJRINGKOPPELINGEN ( SNIJRING & DRUKMOER ) KOPPELEN EN ONTKOPPELEN VAN DE LEIDING KAN HERHAALD WORDEN ZONDER BESCHADIGING

Nadere informatie

Settings for the C100BRS4 MAC Address Spoofing with cable Internet.

Settings for the C100BRS4 MAC Address Spoofing with cable Internet. Settings for the C100BRS4 MAC Address Spoofing with cable Internet. General: Please use the latest firmware for the router. The firmware is available on http://www.conceptronic.net! Use Firmware version

Nadere informatie

Gerontologie Fontys / HOG Bouw en Ruimte

Gerontologie Fontys / HOG Bouw en Ruimte ! "#$%& # $ ' #!"#$% &' (() ()% *# *# +# Dort Spierings, HAN AiH 1 ((),-.% / 0'# 1/%& 2)3 ' #'#1' 234 56#' 278 97) Dort Spierings, HAN AiH 2 *+$ :+ $%;! + $% & # ), 5> "?&# /#&%# %!= &#&# # &#&#

Nadere informatie

Business as an engine for change.

Business as an engine for change. Business as an engine for change. In the end, the success of our efforts will be measured against how we answered what we have found to be the fundamental question: how do we love all the children, of

Nadere informatie

FSW-VW-2X2 FSW-VW. Handleiding / Manual

FSW-VW-2X2 FSW-VW. Handleiding / Manual FSW-VW-2X2 FSW-VW Handleiding / Manual Rev. 1.0 17-03-2014 I Pakketinhoud / Content Accessoires Benodigde gereedschappen / Required Tools Montage / Assembling Onderhoud / Maintenance Veel Gestelde Vragen

Nadere informatie

AF-61 transformatie van een bedrijfsverzamelgebouw interieur ontwerp opgeleverd december 2013

AF-61 transformatie van een bedrijfsverzamelgebouw interieur ontwerp opgeleverd december 2013 AF-61 transformatie van een bedrijfsverzamelgebouw interieur ontwerp opgeleverd december 2013 Een bestaand kantoorgebouw op het Schinkel terrein In Amsterdam wordt nieuw leven ingeblazen als bedrijfsverzamelgebouw.

Nadere informatie

FOR DUTCH STUDENTS! ENGLISH VERSION NEXT PAGE

FOR DUTCH STUDENTS! ENGLISH VERSION NEXT PAGE FOR DUTCH STUDENTS! ENGLISH VERSION NEXT PAGE Tentamen Analyse 8 december 203, duur 3 uur. Voeg aan het antwoord van een opgave altijd het bewijs, de berekening of de argumentatie toe. Als jeeen onderdeel

Nadere informatie

Comics FILE 4 COMICS BK 2

Comics FILE 4 COMICS BK 2 Comics FILE 4 COMICS BK 2 The funny characters in comic books or animation films can put smiles on people s faces all over the world. Wouldn t it be great to create your own funny character that will give

Nadere informatie

SPL D2 MKII GEBRUIKSAANWIJZING USER MANUAL

SPL D2 MKII GEBRUIKSAANWIJZING USER MANUAL SPL D2 MKII GEBRUIKSAANWIJZING USER MANUAL Spl-D2 Next generation Inleiding De SPL5-D2 unit is een geluidsdrukmeter die gekoppeld kan worden aan de SPL5. Het apparaat kan ook als losse geluidsdrukmeter

Nadere informatie

The downside up? A study of factors associated with a successful course of treatment for adolescents in secure residential care

The downside up? A study of factors associated with a successful course of treatment for adolescents in secure residential care The downside up? A study of factors associated with a successful course of treatment for adolescents in secure residential care Annemiek T. Harder Studies presented in this thesis and the printing of this

Nadere informatie

Verschil in Perceptie over Opvoeding tussen Ouders en Adolescenten en Alcoholgebruik van Adolescenten

Verschil in Perceptie over Opvoeding tussen Ouders en Adolescenten en Alcoholgebruik van Adolescenten Verschil in Perceptie over Opvoeding tussen Ouders en Adolescenten en Alcoholgebruik van Adolescenten Difference in Perception about Parenting between Parents and Adolescents and Alcohol Use of Adolescents

Nadere informatie

Power Quality aspecten van LED-lampen.

Power Quality aspecten van LED-lampen. Power Quality aspecten van LED-lampen. Hoe meet je die en wat betekent het voor de praktijk? Mark Vloemans AR Benelux Timothy Hertstein ZES ZIMMER Onderwerpen o Aanleiding o Wat is de Power Factor? o Hoe

Nadere informatie

SMS-200/300/400 tapes & ribbons

SMS-200/300/400 tapes & ribbons SMS-200/300/400 tapes & ribbons ST700 Series Premium Industrial Vinyl Application: General industrial labels Outside durability Average 7 to 10 years Adhesive: Permanent Acrylic Users Temp.: Between -40

Nadere informatie

Nieuwsbrief NRGD. Editie 11 Newsletter NRGD. Edition 11. pagina 1 van 5. http://nieuwsbrieven.nrgd.nl/newsletter/email/47

Nieuwsbrief NRGD. Editie 11 Newsletter NRGD. Edition 11. pagina 1 van 5. http://nieuwsbrieven.nrgd.nl/newsletter/email/47 pagina 1 van 5 Kunt u deze nieuwsbrief niet goed lezen? Bekijk dan de online versie Nieuwsbrief NRGD Editie 11 Newsletter NRGD Edition 11 17 MAART 2010 Het register is nu opengesteld! Het Nederlands Register

Nadere informatie

De Levende Gevel. Een richting voor innovatie en de ontwikkeling van de toekomst

De Levende Gevel. Een richting voor innovatie en de ontwikkeling van de toekomst De Levende Gevel Een richting voor innovatie en de ontwikkeling van de toekomst A letter from nature Dear., Our life knows no boundaries, we live together. You live in me and I live in you! I not only

Nadere informatie

Feedback WG System Operations 21 November 2012

Feedback WG System Operations 21 November 2012 Feedback WG System Operations 21 November 2012 User Group 06/12/2012 Wim Michiels Content Feedback IGCC Winter action plan Draft ENTSO-E winter outlook 2012 2013 Capaciteit noordgrens Overview of dynamic

Nadere informatie

PIR DC-SWITCH. DC Passive infra-red Detector. Model No. PDS-10 GEBRUIKSAANWIJZING/INSTRUCTION MANUAL

PIR DC-SWITCH. DC Passive infra-red Detector. Model No. PDS-10 GEBRUIKSAANWIJZING/INSTRUCTION MANUAL PIR DC-SWITCH DC Passive infra-red Detector Model No. PDS-10 GEBRUIKSAANWIJZING/INSTRUCTION MANUAL Please read this manual before operating your DETECTOR PIR DC-Switch (PDS-10) De PDS-10 is een beweging

Nadere informatie

Hoe maak ik zelf AngelEyes? / How to make AngelEyes?

Hoe maak ik zelf AngelEyes? / How to make AngelEyes? Hoe maak ik zelf AngelEyes? / How to make AngelEyes? Verwijder de clips bovenaan de gril. Dit zijn platte klemmetjes (3 stuks in totaal) Remove de clips on top of the grill. These are those flat things

Nadere informatie

een kopie van je paspoort, een kopie van je diploma voortgezet onderwijs (hoogst genoten opleiding), twee pasfoto s, naam op de achterkant

een kopie van je paspoort, een kopie van je diploma voortgezet onderwijs (hoogst genoten opleiding), twee pasfoto s, naam op de achterkant Vragenlijst in te vullen en op te sturen voor de meeloopochtend, KABK afdeling fotografie Questionnaire to be filled in and send in before the introduction morning, KABK department of Photography Stuur

Nadere informatie

Knelpunten in Zelfstandig Leren: Zelfregulerend leren, Stress en Uitstelgedrag bij HRM- Studenten van Avans Hogeschool s-hertogenbosch

Knelpunten in Zelfstandig Leren: Zelfregulerend leren, Stress en Uitstelgedrag bij HRM- Studenten van Avans Hogeschool s-hertogenbosch Knelpunten in Zelfstandig Leren: Zelfregulerend leren, Stress en Uitstelgedrag bij HRM- Studenten van Avans Hogeschool s-hertogenbosch Bottlenecks in Independent Learning: Self-Regulated Learning, Stress

Nadere informatie

XTRA LEUK DOCUMENTATION SHOPPEN IN DECEMBER

XTRA LEUK DOCUMENTATION SHOPPEN IN DECEMBER FREE DOCUMENTATION Promotion for the gift-wrapping service/shop was part of the XTRA Leuk Shoppen in de Marikenstraat (XTRA Great Shopping in Marikenstraat) campaign, which also communicated about Sunday

Nadere informatie

Venneppark N207 Valutaweg ong. NIEUW-VENNEP

Venneppark N207 Valutaweg ong. NIEUW-VENNEP Venneppark N207 Valutaweg ong. NIEUW-VENNEP INFORMATION WITHOUT OBLIGATION Project: "Venneppark N207" is a new high-quality business park in Nieuw-Vennep Zuid with building plots as of approx. 1.500 sq.m

Nadere informatie

Session Educa-on. 14-15 October 2013

Session Educa-on. 14-15 October 2013 Session Educa-on 14-15 October 2013 FIRE facilities in education: Networking courses (fixed and wireless) IP fixed networks ComNet Labs Build your own network [Lab router] Calculate IP ranges According

Nadere informatie

Intercultural Mediation through the Internet Hans Verrept Intercultural mediation and policy support unit

Intercultural Mediation through the Internet Hans Verrept Intercultural mediation and policy support unit 1 Intercultural Mediation through the Internet Hans Verrept Intercultural mediation and policy support unit 2 Structure of the presentation - What is intercultural mediation through the internet? - Why

Nadere informatie

IDENTITEIT IN DE METHODE?

IDENTITEIT IN DE METHODE? 74 IDENTITEIT IN DE METHODE? ONDERZOEK DOOR EEN LERAAR IN OPLEIDING Bram de Muynck en Esther Langerak 75 Van lectoraten wordt gevraagd om ook studenten te betrekken bij onderzoek. Dit gebeurt bij het lectoraat

Nadere informatie

Synergia - Individueel rapport

Synergia - Individueel rapport DOELSTELLING : Ensuring sufficient funding for projects in cost-generating departments of 16.04.2014 16.04.2014 13:53 1. Inleiding Deze inleiding is vrij te bepalen bij de aanmaak van het rapport. 16.04.2014

Nadere informatie

Turn-key platform Newz. Big Content & Semantics

Turn-key platform Newz. Big Content & Semantics Introduction Michel de Ru Solution architect @ Dayon 16 years experience in publishing Among others Wolters-Kluwer, Sdu (ELS) and Dutch Railways Specialized in Content related Big Data challenges Specialized

Nadere informatie

Non-Obligatory information TO LET Shannonweg 15 Rotterdam Botlek

Non-Obligatory information TO LET Shannonweg 15 Rotterdam Botlek Non-Obligatory information TO LET Shannonweg 15 Rotterdam Botlek Pagina 1 Property Location To Let Shannonweg 15 in Rotterdam-Botlek. Distripark Botlek is excellently situated in the Rotterdam Port area.

Nadere informatie